user image ANAND KUMAR VISHWAKARMA

posted on 13 Oct 2022

I applied via Referral and was interviewed before Oct 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Mechanical engineering questions and P.way questions
Round 3 - One-on-one 

(1 Question)

  • Q1. Askes about sallary and previous working experience in company
Round 4 - Railway exam 

(1 Question)

  • Q1. Technical question exam, practical then

Interview Preparation Tips

Interview preparation tips for other job seekers - I have learn about Hydraulic system, pneumatic system, steel plant maintenance and project work and now I am working in Indian Railway as a USFD Supervisor.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. What are the dimensions of a standard brick?
  • Q2. What is the water-cement ratio?
  • Q3. What is the heat of hydration?
  • Q4. What is curing?
  • Q5. What is footing and foundation?
  • Q6. What is one way slab and two way slab?

Interview Preparation Tips

Topics to prepare for Kirloskar Brothers Civil Site Engineer interview:
  • Hr Fresher
Interview preparation tips for other job seekers - Civil engineering is a significant contribution that is essential for our lives.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Different between Ndt and non ndt
  • Ans. 

    NDT (Non-Destructive Testing) involves testing materials without causing damage, while non-NDT methods may involve destructive testing.

    • NDT methods include ultrasonic testing, radiography, magnetic particle testing, and dye penetrant testing.

    • Non-NDT methods may include cutting, drilling, or breaking materials to test their properties.

    • NDT is commonly used in industries like aerospace, automotive, and construction to ensu...

  • Answered by AI
  • Q2. Which electrode is use welding purpose for corbon steel to alloy steel
  • Ans. 

    For welding carbon steel to alloy steel, the electrode commonly used is E7018.

    • E7018 electrode is commonly used for welding carbon steel to alloy steel

    • It is a low-hydrogen electrode that provides strong welds with good impact resistance

    • The electrode operates on DC current and is suitable for both vertical and overhead welding positions

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Ecinomiser coil material specification
  • Ans. 

    Economizer coil material specification is typically stainless steel or aluminum.

    • Economizer coils are commonly made of stainless steel or aluminum for corrosion resistance and durability.

    • The material specification for economizer coils may vary depending on the specific application and operating conditions.

    • Stainless steel economizer coils are preferred for high temperature and corrosive environments, while aluminum coils...

  • Answered by AI
  • Q2. Superheated coil material specification
  • Ans. 

    Superheated coil material specification is typically stainless steel due to its high temperature resistance and durability.

    • Stainless steel is commonly used for superheated coil material due to its high temperature resistance

    • Other materials like nickel alloys may also be used for specific applications

    • Material specifications should meet the required temperature and pressure ratings for the superheated coil

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Different between accounts and accountability
  • Ans. 

    Accounts are financial records, while accountability is the responsibility to justify actions and decisions.

    • Accounts refer to financial records of transactions, while accountability refers to the obligation to explain and justify actions.

    • Accounts are used to track financial activities and performance, while accountability ensures transparency and integrity in decision-making.

    • Examples: Keeping accurate accounts of proje...

  • Answered by AI
  • Q2. How to check materials
  • Ans. 

    Materials can be checked by conducting visual inspections, performing tests, and verifying documentation.

    • Conduct visual inspections to check for any defects or damages

    • Perform tests such as strength tests, hardness tests, and chemical tests

    • Verify documentation such as certificates of conformity and material test reports

    • Ensure materials meet specifications and standards set by the project

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Site Engineer interview:
  • thermal power project
Interview preparation tips for other job seekers - Knowledge is very important for engineering
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. There are many questions about previous experience and personal background.
  • Q2. Why are you losing your current Job?
Round 2 - Technical 

(1 Question)

  • Q1. How to manage team in EPC project.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About civil structure
Round 3 - Technical 

(1 Question)

  • Q1. About civil structure
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Share about you experience and plan
  • Q2. Tell something about your target achieve
  • Q3. Which metal you mostly work?
  • Ans. 

    I mostly work with steel as it is a versatile and durable metal.

    • Steel is widely used in construction and manufacturing industries.

    • It is known for its strength, durability, and versatility.

    • Examples of steel products include beams, pipes, and wires.

  • Answered by AI
  • Q4. Why you live your last company?
  • Q5. Total manpower in your underwork

Interview Preparation Tips

Interview preparation tips for other job seekers - Duty is our festival

The India Thermit Corporation Interview FAQs

How many rounds are there in The India Thermit Corporation Site Supervisor interview?
The India Thermit Corporation interview process usually has 4 rounds. The most common rounds in the The India Thermit Corporation interview process are Resume Shortlist, Technical and One-on-one Round.
How to prepare for The India Thermit Corporation Site Supervisor interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at The India Thermit Corporation. The most common topics and skills that interviewers at The India Thermit Corporation expect are Field Work, Project Management, Site Supervision and site.
What are the top questions asked in The India Thermit Corporation Site Supervisor interview?

Some of the top questions asked at the The India Thermit Corporation Site Supervisor interview -

  1. Mechanical engineering questions and P.way questi...read more
  2. Technical question exam, practical t...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 835 Interviews
JSW Steel Interview Questions
3.9
 • 578 Interviews
UltraTech Cement Interview Questions
4.2
 • 551 Interviews
Thermax Limited Interview Questions
4.2
 • 246 Interviews
Grasim Industries Interview Questions
4.0
 • 205 Interviews
ACC Interview Questions
3.9
 • 187 Interviews
Ambuja Cements Interview Questions
3.9
 • 108 Interviews
View all
The India Thermit Corporation Site Supervisor Salary
based on 5 salaries
₹1.7 L/yr - ₹2.1 L/yr
36% less than the average Site Supervisor Salary in India
View more details

The India Thermit Corporation Site Supervisor Reviews and Ratings

based on 2 reviews

3.5/5

Rating in categories

2.7

Skill development

3.5

Work-life balance

3.5

Salary

2.7

Job security

2.7

Company culture

2.7

Promotions

3.5

Work satisfaction

Explore 2 Reviews and Ratings
Executive Accountant
10 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Production Engineer
8 salaries
unlock blur

₹2.4 L/yr - ₹3.3 L/yr

Maintenance Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹6.5 L/yr

Data Entry Operator
7 salaries
unlock blur

₹2 L/yr - ₹3.2 L/yr

Site Incharge
7 salaries
unlock blur

₹1.9 L/yr - ₹4.2 L/yr

Explore more salaries
Compare The India Thermit Corporation with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Resources

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview