I applied via LinkedIn and was interviewed in Jan 2022. There were 3 interview rounds.
To prepare a schedule from scratch, update progress, identify delay, identify the activity causing delay, and do resource leveling, follow these steps:
Define project scope and objectives
Break down the project into smaller tasks and activities
Determine the duration and dependencies of each activity
Create a network diagram and Gantt chart
Assign resources and estimate costs
Update progress regularly and adjust the schedule...
Top trending discussions
I was interviewed before Feb 2024.
AC-DC converter converts alternating current (AC) to direct current (DC) for various applications.
AC voltage is converted to DC voltage using rectifiers
Rectifiers can be half-wave, full-wave, or bridge rectifiers
Filtering is done to smooth out the output voltage
Examples include power supplies for electronic devices and battery chargers
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 25 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 9 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 26 Mar 2024
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
A water flow diagram of a Water Treatment Plant (WTP) shows the path of water through various treatment processes.
The diagram typically starts with raw water intake from a source such as a river or reservoir.
It then shows the water passing through processes like screening, coagulation, flocculation, sedimentation, filtration, and disinfection.
Finally, the treated water is stored in a clear well before distribution to c...
The capacity of structures in a Water Treatment Plant (WTP) is crucial for ensuring efficient operation and meeting demand.
Capacity of structures in a WTP refers to the maximum amount of water or waste that can be processed or stored.
Examples of structures in a WTP include sedimentation tanks, filters, pumps, and storage tanks.
Calculating the capacity involves considering factors like flow rates, retention times, and p...
posted on 7 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
Assistant Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Assistant
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
TITAGARH WAGONS
Kalindee Rail Nirman (E)
BEML
Hind Rectifiers