Filter interviews by
I applied via Company Website and was interviewed before May 2023. There were 3 interview rounds.
Technical test according to our discipline
Group Discussion with a group of 15 people on current technology topics
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Top trending discussions
posted on 30 Dec 2024
I applied via LinkedIn and was interviewed in Nov 2024. There were 4 interview rounds.
Theft case investigation
Implementing security measures, conducting regular audits, training staff, utilizing technology
Implementing security measures such as installing surveillance cameras, alarms, and access control systems
Conducting regular audits to identify any vulnerabilities or gaps in security
Training staff on theft prevention techniques and the importance of reporting suspicious behavior
Utilizing technology such as RFID tags or GPS t...
Implementing security policy, procedures, and protocols involves creating guidelines, rules, and processes to protect assets and mitigate risks.
Develop a comprehensive security policy that outlines the organization's security goals, objectives, and responsibilities.
Establish procedures for implementing the security policy, including access control, incident response, and security awareness training.
Define protocols for...
My drafting and communication skills are strong, with experience in writing detailed security reports and effectively communicating with team members.
Proficient in drafting detailed security reports
Skilled in effectively communicating with team members
Experience in creating clear and concise security policies and procedures
Ability to convey complex security information in a clear and understandable manner
Yes, I am able to make theft investigation reports.
Gather all relevant information and evidence related to the theft
Interview witnesses and suspects to gather additional information
Analyze the collected data to identify patterns and potential suspects
Document findings, conclusions, and recommendations in a detailed report
Discussed how to work n CTC expectation
posted on 19 Dec 2024
I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.
Passion for managing civil projects
Proven track record of successful project completions
Excited about the opportunity to contribute to impactful infrastructure projects
I requested a salary hike due to increased responsibilities, achievements, and market value.
Increased responsibilities in current role
Achievements such as successful completion of projects or exceeding targets
Market value based on industry standards and experience
Cost of living increase or inflation affecting expenses
The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.
Site preparation involves clearing the area and leveling the ground for construction.
Excavation is the process of digging a hole in the ground to create space for the foundation.
Foundation design is crucial to ensure the building's stability and load-be...
The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.
Design mix is determined based on the required strength and durability of the concrete
It involves selecting the right proportions of cement, sand, aggregates, and water
Various factors like type of construction, exposure conditions, and desired workability influence...
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
Very nicely & strictly selected
I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
The life cycle of an asset refers to the stages it goes through from acquisition to disposal.
Acquisition: The asset is obtained and put into use.
Utilization: The asset is used for its intended purpose.
Maintenance: Regular maintenance and repairs are performed to ensure optimal performance.
Depreciation: The asset loses value over time due to wear and tear.
Disposal: The asset is either sold, scrapped, or otherwise dispos...
Depreciation is for tangible assets like buildings and machinery, while amortization is for intangible assets like patents and copyrights.
Depreciation is the allocation of the cost of tangible assets over their useful life.
Amortization is the allocation of the cost of intangible assets over their useful life.
Depreciation is typically used for assets like buildings, machinery, and vehicles.
Amortization is typically used...
Asset under construction refers to assets that are being constructed or developed but are not yet completed and ready for use.
Assets under construction are not yet in use and are still being developed or built.
These assets are typically recorded as a separate category on the balance sheet until they are completed and ready for use.
Examples include buildings, machinery, and infrastructure projects that are still in the
Asset revaluation is the process of adjusting the value of assets on a company's balance sheet to reflect their current market value.
Asset revaluation is typically done to ensure that the assets are not carried on the balance sheet at a value that is significantly different from their current market value.
Revaluation can result in an increase or decrease in the value of assets, which can impact the company's financial ...
Certification of standing orders involves submission, verification, and approval by the certifying officer.
Employer submits draft standing orders to certifying officer
Certifying officer verifies compliance with Industrial Employment (Standing Orders) Act, 1946
If compliant, certifying officer approves and certifies the standing orders
Certification is valid for 5 years, after which renewal is required
Gratuity will be forfeited if an employee is terminated due to misconduct or violation of company policies.
Gratuity will be forfeited if the employee is terminated for misconduct or violation of company policies.
It will also be forfeited if the employee resigns before completing 5 years of continuous service.
Gratuity is not forfeited if the employee completes 5 years of continuous service or in case of death or disabil
Yes, I am willing to relocate wherever the company needs me to.
I am open to relocating for career opportunities and growth.
I understand that flexibility is important in a management trainee role.
I have discussed relocation with my spouse and we are both prepared for it.
I am excited about the prospect of experiencing new places and cultures.
I am committed to my career development and willing to go where the company need
Seeking new challenges and growth opportunities in a more dynamic work environment.
Desire for career advancement
Looking for new challenges
Seeking growth opportunities
Change in work environment
posted on 1 Jan 2025
Acidic materials can be used to lower pH levels.
Use sulfuric acid to lower pH levels in water treatment processes.
Add citric acid to adjust pH in food and beverages.
Use vinegar (acetic acid) to lower pH in cooking recipes.
China Steel offers a stable career with opportunities for growth and development in the steel industry.
China Steel is a reputable company with a strong presence in the steel industry.
Opportunities for career growth and development within the company.
Stable job security and benefits for employees.
Chance to work with cutting-edge technology and processes in the steel manufacturing sector.
Design Engineer
14
salaries
| ₹4 L/yr - ₹9 L/yr |
Assistant Manager
9
salaries
| ₹12.5 L/yr - ₹23.4 L/yr |
CAD Engg
8
salaries
| ₹3.2 L/yr - ₹5.1 L/yr |
Senior Engineer
8
salaries
| ₹5.2 L/yr - ₹9 L/yr |
Deputy Manager
7
salaries
| ₹5.2 L/yr - ₹18 L/yr |
TK Elevator
Outotec
Metso Outotec
FLSmidth