Filter interviews by
I applied via Company Website and was interviewed before Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
GENERAL APTITITUDE TEST - GENERAL AND NUMERICAL QUESTIONS.
GLOBAL RECESSIONS- ITS EFFECTS
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
Memory leaks in frameworks can be fixed by identifying and removing the root cause of the leak.
Identify the source of the leak using memory profiling tools
Analyze the code to find the root cause of the leak
Fix the code by releasing unused memory or optimizing memory usage
Test the framework thoroughly to ensure the leak has been fixed
A media player design framework should prioritize user experience, ease of use, and accessibility.
Include intuitive controls for playback, volume, and playlist management
Ensure compatibility with a variety of media formats
Consider incorporating features such as equalizer settings and visualizations
Design for accessibility with options for closed captioning and audio descriptions
Prioritize a clean and visually appealing
I applied via Job Portal and was interviewed before Oct 2023. There was 1 interview round.
posted on 24 Feb 2022
I applied via Job Portal and was interviewed in Jan 2022. There were 3 interview rounds.
A view template is a set of predefined settings that can be applied to views in a BIM model.
View templates help maintain consistency in views throughout a project
They can include settings for visibility, graphic display, scale, and more
View templates can be customized and saved for future use
posted on 18 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
There is a 2 hours revit test
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
No, BIM is not only used for pre construction.
BIM is used throughout the entire lifecycle of a building project, from design to construction and even post-construction.
During pre-construction, BIM helps in visualizing the project, identifying clashes, and optimizing design.
During construction, BIM aids in coordination, scheduling, and cost estimation.
After construction, BIM can be used for facility management, maintena...
Phasing in Revit refers to the process of organizing and managing the construction timeline of a project.
Phasing allows architects to create and track different stages of a project, such as existing, new construction, and demolition.
Each phase can have its own set of elements, properties, and visibility settings.
Phasing helps in coordinating design changes, analyzing construction sequencing, and generating accurate con...
Yes, I have worked on several BIM projects in the past.
I have experience working with BIM software such as Revit and AutoCAD.
I have collaborated with architects, engineers, and contractors to develop BIM models for construction projects.
I have utilized BIM to create detailed 3D models, generate accurate quantity takeoffs, and facilitate clash detection.
I have successfully implemented BIM workflows to improve project co...
BIM stands for Building Information Modeling. It is a digital representation of a building's physical and functional characteristics.
BIM is a collaborative process that involves architects, engineers, contractors, and owners.
It helps in creating a virtual model of a building before it is constructed.
BIM includes information about the building's design, construction, and maintenance.
It allows for better communication an...
I expect a competitive salary based on my experience, skills, and the responsibilities of the role.
I am looking for a salary that reflects my expertise in BIM architecture.
I would like to discuss the salary range for this position during the negotiation process.
I am open to considering a compensation package that includes benefits and bonuses.
I believe my skills and qualifications warrant a fair and competitive salary.
I am willing to give my full-time commitment to this firm.
I am dedicated to working full-time and giving my best to the firm.
I understand the importance of time and will prioritize my work accordingly.
I am committed to meeting deadlines and delivering high-quality work.
I am open to working overtime or putting in extra hours when necessary.
I am excited about the opportunity to contribute to the firm's success and growth
I applied via Indeed and was interviewed in Sep 2024. There were 2 interview rounds.
To unhide or make a floor visible in a plan view, you can adjust the visibility settings in the software.
Go to the visibility settings or layers panel in the software.
Find the layer corresponding to the floor you want to unhide or make visible.
Check the visibility status of that layer and toggle it on if it is currently hidden.
Refresh the plan view to see the changes.
Alternatively, you can use shortcut keys or commands
Use materials with different colors or textures to create visually appealing walls without overriding.
Use different colored bricks or tiles for a unique pattern
Apply wallpaper with various designs and colors
Use paint with different finishes (matte, glossy, metallic) for a textured look
Construction templates focus on the physical aspects of a project, while architectural templates focus on the design and aesthetic aspects.
Construction templates include details like materials, dimensions, and structural elements.
Architectural templates focus on design elements such as floor plans, elevations, and aesthetics.
Construction templates are more technical and detailed, while architectural templates are more ...
I would start by analyzing the given AutoCAD drawings to understand the dimensions and details of the staircase section.
Analyze the provided AutoCAD drawings to understand the dimensions and details of the staircase section
Use appropriate tools in the software to replicate the staircase section accurately
Pay attention to details such as tread depth, riser height, and handrail design
Ensure that the staircase complies wi
Slope ratio can be added by adjusting the elevation of elements in the BIM model.
Adjust the elevation of elements to create the desired slope ratio.
Use tools in the BIM software to set the slope ratio for specific elements.
Ensure that the slope ratio is consistent and accurate throughout the model.
Consider the design requirements and standards when determining the slope ratio.
based on 1 review
Rating in categories
BIM Engineer
38
salaries
| ₹2.7 L/yr - ₹7 L/yr |
Senior BIM Engineer
11
salaries
| ₹4.2 L/yr - ₹8.2 L/yr |
BIM Coordinator
6
salaries
| ₹6.5 L/yr - ₹10 L/yr |
Software Developer
5
salaries
| ₹3 L/yr - ₹6 L/yr |
BIM Architect
5
salaries
| ₹3 L/yr - ₹4 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning