Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Communicate openly, provide support, set clear expectations, offer solutions
Communicate openly with designers to understand their challenges and concerns
Provide support and resources to help designers overcome tough times
Set clear expectations and goals to keep designers focused and motivated
Offer solutions and brainstorm ideas together to find the best way forward
I led the design and implementation of a power distribution system, ensuring efficiency and safety standards were met.
Conducted detailed analysis of project requirements and specifications.
Designed the power distribution system using AutoCAD and MATLAB.
Collaborated with cross-functional teams to integrate electrical systems with mechanical components.
Performed simulations to validate system performance under various lo...
Top trending discussions
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I appeared for an interview before Apr 2024, where I was asked the following questions.
I manage pressure by prioritizing tasks, maintaining clear communication, and practicing stress-relief techniques.
Prioritization: I use tools like the Eisenhower Matrix to identify urgent and important tasks, ensuring I focus on what truly matters.
Time Management: I break projects into smaller tasks with deadlines, which helps me avoid feeling overwhelmed.
Clear Communication: I keep stakeholders informed about progress...
I appeared for an interview in Jul 2022.
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects incl...
posted on 27 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.
System studies involve analyzing the behavior of electrical systems under different operating conditions.
They help identify potential issues and optimize the performance of the system.
Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.
Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.
Load flow study helps in determining the steady-state operating conditions of a power system.
It involves calculating the voltage magnitude and phase angle at each bus in the network.
The study considers factors like power generation, transmission line losses, and load demand.
It helps in identify...
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Senior Designer
45
salaries
| ₹15.8 L/yr - ₹17.8 L/yr |
Piping Designer
43
salaries
| ₹5 L/yr - ₹16.5 L/yr |
Process Engineer
38
salaries
| ₹5.2 L/yr - ₹17.5 L/yr |
Instrument Engineer
33
salaries
| ₹6.8 L/yr - ₹20.2 L/yr |
Piping Stress Engineer
20
salaries
| ₹5 L/yr - ₹16.5 L/yr |
AECOM
AtkinsRealis
Saipem
Nasser S. Al Hajri Corporation