i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
To maintain a store, it is important to organize inventory, implement proper storage techniques, conduct regular stock checks, and ensure cleanliness.
Organize inventory by categorizing items and using proper labeling
Implement proper storage techniques such as using shelves, racks, and bins
Conduct regular stock checks to track inventory levels and identify any discrepancies
Ensure cleanliness by regularly cleaning the st...
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
posted on 8 Jul 2024
Conduits and wiring are the electrical materials used before wall plastering.
Conduits are pipes or tubes used to protect and route electrical wiring before plastering.
Wiring refers to the electrical cables that will be hidden behind the plastered walls.
These materials are essential for safely and securely installing electrical systems in buildings.
CP fittings for a bathroom include faucets, shower heads, towel racks, and soap dishes.
Faucets are essential for sinks and showers
Shower heads provide water for bathing
Towel racks are used to hang towels
Soap dishes hold soap for washing hands
CP fittings are typically made of chrome-plated brass for durability
posted on 5 Jun 2022
Bulk items refer to products that are sold in large quantities or sizes, typically for commercial or industrial use.
Bulk items are usually purchased in large quantities to save money on per unit costs.
Examples of bulk items include rice, flour, sugar, cleaning supplies, and construction materials.
Bulk items are commonly found in wholesale stores or warehouses.
Bulk items are often packaged in larger containers or bags c
Diesel density is the mass of diesel fuel per unit volume.
Diesel density is typically around 0.85 grams per cubic centimeter.
It is important for calculating fuel efficiency and storage capacity.
Density can vary slightly depending on the temperature and composition of the diesel fuel.
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
I can handle inventory efficiently by implementing proper tracking systems and conducting regular audits.
Implementing a barcode system for easy tracking
Conducting regular physical inventory counts
Analyzing sales data to forecast demand
Maintaining accurate records of all inventory transactions
Ensuring proper storage and handling of inventory
Collaborating with other departments to optimize inventory levels
posted on 2 Sep 2021
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
posted on 15 Apr 2023
Good working best opportunity better' experience
Methods for measuring and testing various construction materials
Sand aggregate can be measured by weight or volume
Steel can be measured by weight or length
MS plate can be measured by thickness and size
Wood materials can be measured by length, width, and thickness
Quality tests for bulk materials can include strength, durability, and moisture content
I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 30 Nov 2022
To maintain a store, proper organization and inventory management are essential. Materials can be received through various methods such as purchase orders, deliveries, or transfers.
Implement a systematic inventory management system
Ensure proper organization and labeling of items
Regularly conduct stock checks and audits
Establish clear procedures for receiving materials
Verify the quantity and quality of received material...
Most should be group discussion because it's we take a lot of solutions.
based on 41 reviews
Rating in categories
Deputy Manager
1.1k
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Assistant Manager
708
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
389
salaries
| ₹8 L/yr - ₹24.1 L/yr |
Senior Engineer
389
salaries
| ₹3.5 L/yr - ₹13.5 L/yr |
Senior Manager
347
salaries
| ₹12 L/yr - ₹32.5 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company