Filter interviews by
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Oct 2018. There were 5 interview rounds.
I am drawn to your organisation's commitment to innovation and employee development. I expect opportunities for growth and a supportive work culture.
I am impressed by the company's track record of innovation and success in the industry.
I value the emphasis on employee development and growth opportunities within the organisation.
I am looking for a supportive work culture that values teamwork and collaboration.
I expect c...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
Day to day life topics like Current affairs
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
posted on 21 Feb 2023
I applied via Campus Placement and was interviewed in Jan 2023. There were 2 interview rounds.
Steel making furnace is a high-temperature vessel where raw materials are melted and transformed into steel.
The furnace is typically lined with refractory materials to withstand high temperatures.
Raw materials such as iron ore, coke, and limestone are added to the furnace.
The reactions that occur in the furnace include combustion of coke to produce heat, reduction of iron ore to iron, and formation of slag.
The temperat...
Iron is stronger and more durable than aluminium, but aluminium is lighter and more corrosion-resistant.
Iron has a higher tensile strength and is more resistant to impact and wear than aluminium.
Aluminium is lighter and more malleable than iron, making it easier to shape and form.
Iron is more prone to rust and corrosion than aluminium, which has a natural oxide layer that protects it from corrosion.
Aluminium has a high...
Adding copper to an alloy increases conductivity.
Copper is a highly conductive metal.
Adding copper to an alloy increases the number of free electrons available for conduction.
The increase in conductivity depends on the amount of copper added and the other metals in the alloy.
Examples of copper alloys with high conductivity include brass and bronze.
Alloying elements can increase or decrease the melting point of a metal depending on their properties.
Adding elements with higher melting points can increase the melting point of the metal.
Adding elements with lower melting points can decrease the melting point of the metal.
Alloying elements can also affect the crystal structure of the metal, which can impact its melting point.
Examples include adding carbon to iron to ...
I am a motivated and dedicated individual with strong leadership skills. My strength lies in my ability to effectively communicate and collaborate with team members. However, I sometimes struggle with delegating tasks.
Motivated and dedicated individual
Strong leadership skills
Effective communication and collaboration
Struggle with delegating tasks
Endurance is a leading company in the industry, and I am the ideal candidate because of my skills, experience, and passion for the role.
Endurance is a well-established and respected company in the industry.
I have a strong background in management and a proven track record of success.
I am highly motivated and dedicated to achieving goals.
I possess excellent leadership and communication skills.
I am passionate about the i...
posted on 28 May 2024
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
based on 1 interview
Interview experience
Assistant Manager
82
salaries
| ₹4 L/yr - ₹9 L/yr |
Design Engineer
46
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Quality Engineer
41
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Production Engineer
40
salaries
| ₹2.4 L/yr - ₹6.1 L/yr |
Deputy Manager
37
salaries
| ₹7.5 L/yr - ₹13.7 L/yr |
JBM Group
Ceat Tyres
Subros
UNO Minda