i
Tata Advanced Systems
Filter interviews by
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
The half drill angle refers to the angle formed by the cutting edge of a drill bit with the workpiece surface.
Half drill angle is typically measured in degrees.
It is important in determining the efficiency and effectiveness of drilling operations.
A smaller half drill angle results in a sharper cutting edge, while a larger angle provides more strength and stability.
For example, a half drill angle of 90 degrees would mea...
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
posted on 25 Jun 2024
HIRA stands for Hazard Identification and Risk Assessment, while HAZOP stands for Hazard and Operability Study.
HIRA is a systematic process for identifying hazards and assessing risks associated with a particular job or task.
HAZOP is a structured and systematic examination of a planned or existing process or operation to identify and evaluate problems that may represent risks to personnel or equipment.
Both HIRA and HAZ...
posted on 4 Aug 2021
posted on 19 Apr 2021
Raw materials are the basic components used in the production process.
Raw materials are transformed into finished products through the production process.
Examples of raw materials include wood, steel, plastic, and chemicals.
The quality and availability of raw materials can impact production efficiency and cost.
Effective management of raw materials is essential for successful production.
I applied via Campus Placement and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview in Dec 2016.
I applied via Company Website and was interviewed in Mar 2022. There were 3 interview rounds.
Coding test
Aptitude test
Group discussion
posted on 6 May 2024
Value stream mapping is a lean management tool used to visualize and analyze the steps involved in delivering a product or service. 5S is a methodology for organizing a workplace for efficiency and effectiveness.
Value stream mapping helps identify waste and opportunities for improvement in a process.
It involves creating a visual representation of the flow of materials and information from supplier to customer.
5S stands...
Total productive maintenance (TPM) is a proactive approach to maintenance that aims to maximize equipment effectiveness and minimize downtime.
TPM focuses on empowering operators to take ownership of equipment maintenance.
It involves regular equipment inspections, cleaning, and minor repairs to prevent breakdowns.
TPM also includes training employees on proper maintenance techniques and creating a culture of continuous i...
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Assistant Manager
528
salaries
| ₹4.7 L/yr - ₹16.2 L/yr |
Senior Executive
392
salaries
| ₹5 L/yr - ₹11 L/yr |
Assistant Engineer
335
salaries
| ₹1.9 L/yr - ₹5.1 L/yr |
Executive
317
salaries
| ₹3 L/yr - ₹9.1 L/yr |
Officer
245
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Indian Army
Indian Air Force
Hindustan Aeronautics
Indian Navy