I was interviewed in Jan 2025.
posted on 25 Dec 2024
Construction building in raising panel installation involves proper planning, coordination, and adherence to safety regulations.
Ensure all necessary materials and equipment are available before starting the installation process
Coordinate with other trades to ensure smooth workflow and avoid conflicts
Follow safety regulations and guidelines to prevent accidents and injuries
Properly train and supervise workers to ensure ...
posted on 9 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Any work any instructions falo group design installation and maintenance
posted on 11 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I am ready for interview
posted on 20 Feb 2022
posted on 23 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
The location is at XYZ Power Plant and the project name is Upgrade of Electrical Systems.
Location: XYZ Power Plant
Project Name: Upgrade of Electrical Systems
posted on 29 Dec 2023
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
based on 1 interview
Interview experience
Design Engineer
6
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Site Engineer
5
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Supervisor
5
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Breakdown Engineer
5
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Accountant
4
salaries
| ₹2.1 L/yr - ₹2.5 L/yr |
BHEL
Larsen & Toubro Limited
TCS
Reliance Industries