Filter interviews by
I applied via AmbitionBox and was interviewed in Jun 2024. There was 1 interview round.
Basic schedule in maintenance refers to a planned timetable for conducting routine maintenance tasks to ensure equipment reliability and longevity.
Basic schedule in maintenance includes regular inspections, lubrication, cleaning, and minor repairs.
It helps in preventing breakdowns, reducing downtime, and extending the lifespan of equipment.
Examples of basic maintenance schedules include weekly equipment checks, monthly...
PM stands for Preventive Maintenance, which involves regularly scheduled maintenance tasks to prevent breakdowns and prolong the life of machines.
PM involves routine inspections, lubrication, cleaning, and part replacements to ensure machines are operating efficiently.
Examples of PM tasks include changing oil in a car engine, replacing air filters in HVAC systems, and calibrating equipment regularly.
PM helps reduce une...
posted on 11 Dec 2022
HVAC maintenance questions only
posted on 10 Oct 2021
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
No, NC stands for Normally Open and Normally Closed.
No, NC are terms used in electrical circuits.
No refers to Normally Open, which means the circuit is open when there is no current flowing through it.
NC refers to Normally Closed, which means the circuit is closed when there is no current flowing through it.
These terms are commonly used in relays, switches, and other electrical components.
Understanding No, NC is import...
A compressor is a mechanical device that increases the pressure of a gas by reducing its volume.
Compressors are used in various industries such as refrigeration, air conditioning, and gas processing.
They come in different types such as reciprocating, rotary, and centrifugal compressors.
The unit of a compressor is typically measured in cubic feet per minute (CFM) or liters per minute (LPM).
Use a phase failure relay to protect the motor.
Install a phase failure relay to detect the absence of a phase and disconnect the motor from the supply.
Check the motor's wiring and connections to ensure they are correct and secure.
If the motor is already running, shut it down immediately to prevent damage.
Consult with an electrician to determine the cause of the phase failure and resolve the issue.
Consider using a backu...
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
Improving power factor can be achieved by reducing reactive power and increasing active power.
Installing capacitors to reduce reactive power
Using energy-efficient motors and equipment to reduce power losses
Implementing power factor correction techniques
Regular maintenance of electrical equipment
Monitoring power factor and taking corrective actions
Educating employees on energy conservation
Negotiating with utility compan
Assistant Manager
32
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Senior Engineer
17
salaries
| ₹2.5 L/yr - ₹7.2 L/yr |
Quality Engineer
17
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Assistant General Manager
9
salaries
| ₹13 L/yr - ₹18 L/yr |
Supervisor
8
salaries
| ₹2.2 L/yr - ₹3.1 L/yr |
Indus Towers
Bharti Infratel
American Tower Corporation
GTL Infrastructure