Filter interviews by
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
Improving power factor can be achieved by reducing reactive power and increasing active power.
Installing capacitors to reduce reactive power
Using energy-efficient motors and equipment to reduce power losses
Implementing power factor correction techniques
Regular maintenance of electrical equipment
Monitoring power factor and taking corrective actions
Educating employees on energy conservation
Negotiating with utility compan
Top trending discussions
I was interviewed in Oct 2022.
posted on 11 Dec 2022
HVAC maintenance questions only
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Implemented LED lighting in the facility to reduce energy consumption.
Replaced traditional lighting with energy-efficient LED bulbs
Installed motion sensors to automatically turn off lights when not in use
Conducted energy audits to identify areas for improvement
Poka yoke is implemented in our organization to prevent errors and defects in maintenance processes.
Poka yoke, also known as mistake-proofing, is used to design processes in a way that prevents errors from occurring.
Examples of Poka yoke in maintenance engineering include using color-coded tools to prevent using the wrong equipment, or using checklists to ensure all steps are completed correctly.
By implementing Poka yo...
I was interviewed in Oct 2022.
posted on 2 May 2023
I applied via AmbitionBox and was interviewed in Jan 2023. There were 4 interview rounds.
posted on 11 Dec 2022
HVAC maintenance questions only
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Implemented LED lighting in the facility to reduce energy consumption.
Replaced traditional lighting with energy-efficient LED bulbs
Installed motion sensors to automatically turn off lights when not in use
Conducted energy audits to identify areas for improvement
Poka yoke is implemented in our organization to prevent errors and defects in maintenance processes.
Poka yoke, also known as mistake-proofing, is used to design processes in a way that prevents errors from occurring.
Examples of Poka yoke in maintenance engineering include using color-coded tools to prevent using the wrong equipment, or using checklists to ensure all steps are completed correctly.
By implementing Poka yo...
posted on 19 Sep 2022
Engineer
48
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Senior Engineer
48
salaries
| ₹3.8 L/yr - ₹12.9 L/yr |
Junior Engineer
38
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Design Engineer
37
salaries
| ₹2.7 L/yr - ₹6.5 L/yr |
Assistant Manager
29
salaries
| ₹7.8 L/yr - ₹18.8 L/yr |
ABB
Siemens
Schneider Electric
BHEL