Line sizing is the process of determining the appropriate diameter of a pipeline for a given flow rate and fluid properties.
It involves calculating the pressure drop and velocity of the fluid in the pipeline.
Factors such as fluid viscosity, density, and temperature are taken into consideration.
The goal is to ensure that the pipeline can handle the required flow rate without excessive pressure drop or velocity.
Line sizi...
Heat transfer is the movement of thermal energy from one object to another due to a temperature difference.
Heat transfer occurs through three modes: conduction, convection, and radiation.
Conduction is the transfer of heat through a material without any movement of the material itself.
Convection is the transfer of heat through the movement of fluids or gases.
Radiation is the transfer of heat through electromagnetic wave...
Distillation is a process of separating components of a mixture based on their boiling points.
It involves heating the mixture to vaporize the component with the lowest boiling point.
The vapor is then condensed and collected as a separate liquid.
This process can be used to purify liquids, separate different components of a mixture, and extract desired substances from natural sources.
Examples include the production of ga...
Evaporation is the process of converting a liquid into a gas or vapor by heating or reducing pressure.
Evaporation occurs when the molecules of a liquid gain enough energy to break their bonds and become a gas.
It is a natural process that occurs in the water cycle, where water from oceans, lakes, and rivers evaporates due to the sun's heat.
Evaporation is also used in industrial processes to separate liquids from solids ...
Top trending discussions
posted on 22 Jan 2024
I applied via Recruitment Consulltant
posted on 12 May 2024
I applied via Job Fair and was interviewed in Apr 2024. There were 2 interview rounds.
Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces...
posted on 13 Apr 2025
I appeared for an interview in Oct 2024, where I was asked the following questions.
Effective manpower management involves planning, communication, and motivation to optimize productivity and ensure team cohesion.
Assess skills and strengths: Identify individual capabilities to assign appropriate tasks, e.g., matching a skilled welder to complex projects.
Foster open communication: Encourage feedback and discussions to address concerns and improve team dynamics, like regular check-in meetings.
Provide tr...
The manufacturing process for vessels involves design, material selection, fabrication, and quality control to ensure safety and functionality.
1. Design: Initial design is created using CAD software to ensure specifications meet requirements.
2. Material Selection: Common materials include stainless steel, carbon steel, and aluminum, chosen based on the vessel's application.
3. Fabrication: Processes like welding, machin...
posted on 29 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
Developing P&IDs involves systematic design, symbol usage, and adherence to standards for clarity and functionality.
Identify the process: Understand the system and its components, such as pumps, valves, and tanks.
Use standardized symbols: Follow industry standards like ISA or ISO for consistency in representation.
Define connections: Clearly indicate how components are interconnected, including flow directions.
Incor...
Sizing a compressor involves calculating flow rate, pressure, and temperature requirements for optimal performance.
Determine the required flow rate (CFM or L/min) based on system needs.
Calculate the discharge pressure needed for the application, considering system losses.
Account for temperature variations and ensure the compressor can handle them.
Consider the type of gas being compressed, as different gases have differ...
posted on 1 Jul 2022
I applied via Recruitment Consulltant
I applied via LinkedIn and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 19 Oct 2023
posted on 28 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Coding test over phone call. Interviewer would ask questions, we have to come up with logic/ pseudo code
I applied via Walk-in
based on 1 review
Rating in categories
Project Engineer
6
salaries
| ₹1.2 L/yr - ₹3.1 L/yr |
Graduate Engineer Trainee (Get)
5
salaries
| ₹1.1 L/yr - ₹2 L/yr |
Process Engineer
4
salaries
| ₹1.2 L/yr - ₹2.5 L/yr |
Proposal Engineer
4
salaries
| ₹1.8 L/yr - ₹2.9 L/yr |
Operator
4
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Super Auto India
MELCO
Ferromatik Milacron
Lloyd Electric & Engineering