Upload Button Icon Add office photos

Filter interviews by

Suzlon Gujarat Wind Park Engineer Interview Questions and Answers

Updated 5 Dec 2023

Interview questions from similar companies

Engineer Interview Questions & Answers

Vestas user image latest advance guruji 2018

posted on 8 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Why nitrogen gas uses in accumulator?
  • Ans. 

    Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.

    • Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.

    • It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.

    • Nitrogen gas has a stable temperature range, allowi...

  • Answered by AI
  • Q2. Why accumulator is used in WTG
  • Ans. 

    Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.

    • Accumulator helps in smoothing out the power output from the wind turbine.

    • It allows for energy storage when the demand is low and release of stored energy when the demand is high.

    • Accumulators can also help in providing backup power during periods of low wind.

    • Examples of accumulators used in WTG include batteries, flywheels, an

  • Answered by AI
  • Q3. DGR related questions like PLF ,LPF
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Bitwise operator
  • Q2. Function types and storage classes

Engineer Interview Questions & Answers

CESC user image Anonymous

posted on 28 Sep 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Numerical, logical reasoning, verbal ability

Round 2 - Group Discussion 

General topic on current affair in power sector

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Relevant to works which are mentioned in your CV.
  • Q2. Wind turbine terminology, Various electrical troubleshooting, Preventive maintenance?
  • Q3. Wind turbine KPI?
  • Q4. Basic introduction?
Round 2 - Technical 

(1 Question)

  • Q1. Overall summarise your experience relevant to your job role.
Round 3 - HR 

(1 Question)

  • Q1. Discussion about salary expectation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to improve Performance Ratio
  • Ans. 

    To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.

    • Optimize system design and operation to increase efficiency

    • Reduce losses through better maintenance and monitoring

    • Maximize output by utilizing advanced technologies and techniques

  • Answered by AI
  • Q2. What is Capacity utilization factor
  • Ans. 

    Capacity utilization factor is a measure of how much of a system's capacity is being utilized.

    • Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.

    • It is often expressed as a percentage.

    • A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.

    • For example, if a factory has a maximum output of ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What iS GHI & GTI , GPR
  • Ans. 

    GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.

    • GHI is a measure of the total heat input to a system or appliance.

    • GTI is a measure of the efficiency of converting input energy into useful output energy.

    • GPR is a measure of the rate at which a system or appliance produces a certain output.

  • Answered by AI
  • Q2. How to improve the plant PR
  • Ans. 

    Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.

    • Enhance communication with stakeholders through regular updates and transparent information sharing.

    • Engage with the local community through events, workshops, and outreach programs to build positive relationships.

    • Implement sustainable practices and showcase environmental initiatives to improve public perception.

    • Utilize...

  • Answered by AI
Round 1 - Technical 

(1 Question)

  • Q1. Knowledge about Power plant and Thermodynamics
Round 2 - One-on-one 

(1 Question)

  • Q1. Breif discussion about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and sharpen your basis

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to trouble shoot inverters , scbs, transformer, breakers
  • Ans. 

    To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:

    • Check for loose connections and wiring

    • Inspect for physical damage or wear and tear

    • Use a multimeter to test voltage and current

    • Check for proper grounding

    • Refer to manufacturer's manual for specific troubleshooting steps

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep to know

Interview Questionnaire 

2 Questions

  • Q1. Tell me about your self
  • Q2. Time maintenance to your project

Interview Questionnaire 

2 Questions

  • Q1. Earthquake effects on structures and its design process. Richter scale and other scales for earthquakes
  • Ans. 

    Earthquake effects on structures and design process, including Richter scale and other scales.

    • Earthquakes can cause various effects on structures, such as shaking, ground rupture, and liquefaction.

    • The design process for structures takes into account the potential seismic forces and aims to ensure safety.

    • The Richter scale is a logarithmic scale used to measure the magnitude of an earthquake.

    • Other scales used for earthqu...

  • Answered by AI
  • Q2. A building designed for some place like Delhi, later supposed to shifted to Chennai, then will you do changes in the design? If yes explain. Would you prefer OPC or PPC for Delhi climate?

Interview Preparation Tips

Round: Interview
Experience: Will be like a typical PSU interview. Technical questions especially the ones related to your projects can be expected.
Tips: Preparation: Maintain a good CGPA
Scholastic achievements
Projects done

Skill Tips: ""
College Name: IIT Madras

Tell us how to improve this page.

Suzlon Gujarat Wind Park Engineer Salary
based on 10 salaries
₹2.6 L/yr - ₹4.1 L/yr
42% less than the average Engineer Salary in India
View more details

Suzlon Gujarat Wind Park Engineer Reviews and Ratings

based on 4 reviews

5.0/5

Rating in categories

3.3

Skill development

3.0

Work-Life balance

3.8

Salary & Benefits

3.5

Job Security

3.5

Company culture

2.6

Promotions/Appraisal

3.1

Work Satisfaction

Explore 4 Reviews and Ratings
Mechanical Engineer
15 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Assistant Manager
14 salaries
unlock blur

₹6 L/yr - ₹9 L/yr

Electrical Engineer
12 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Engineer
10 salaries
unlock blur

₹2.6 L/yr - ₹4.1 L/yr

Junior Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Suzlon Gujarat Wind Park with

Vestas

4.3
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare

Inox Wind

3.7
Compare

GE Vernova

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview