I applied via Referral and was interviewed in Jun 2022. There were 2 interview rounds.
Top trending discussions
Linux is an open-source operating system based on Unix that is commonly used in servers and embedded systems.
Linux is known for its stability, security, and flexibility.
It is free to use and can be customized to suit specific needs.
Popular distributions of Linux include Ubuntu, CentOS, and Fedora.
Linux uses a command-line interface for system administration tasks.
DNS (Domain Name System) is a system that translates dom...
AWS/Node/spoke refers to a networking concept where a central hub (AWS) connects to multiple smaller hubs (Nodes) through individual connections (spokes).
AWS acts as the central hub in the network architecture
Nodes are smaller hubs that connect to AWS
Spokes are individual connections between AWS and Nodes
This architecture allows for scalable and flexible networking solutions
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Online aptitudes test with resoning and logical reasoning mathematics
This was for versent to know the communication levels it was simple and easy
I applied via LinkedIn and was interviewed in Jun 2022. There was 1 interview round.
Agile methodology is an iterative approach to project management that emphasizes flexibility and customer satisfaction.
Agile methodology involves breaking down a project into smaller, more manageable tasks
It emphasizes collaboration and communication between team members and stakeholders
It allows for changes and adjustments to be made throughout the project
Examples of agile methodologies include Scrum, Kanban, and Lean
...
I monitored risk by identifying potential risks, assessing their likelihood and impact, and developing mitigation strategies.
Identified potential risks through brainstorming sessions and risk assessments
Assessed likelihood and impact of each risk using a risk matrix
Developed mitigation strategies to reduce the likelihood or impact of each risk
Monitored risks throughout the project and updated mitigation strategies as n...
Effort analysis is done by breaking down tasks, estimating time and resources required, and creating a plan.
Break down tasks into smaller components
Estimate time and resources required for each component
Create a plan based on the estimates
Regularly review and update the plan as needed
I applied via Referral and was interviewed before Jun 2019. There were 2 interview rounds.
Digital marketing involves promoting products or services through digital channels such as social media, email, search engines, and websites.
Digital marketing includes various tactics such as SEO, PPC, social media marketing, email marketing, content marketing, and more.
It helps businesses reach their target audience and increase brand awareness.
For example, a company may use Facebook ads to target users based on their...
Intensive study about a person, a group of people or a unit, which is aimed to generalize over several units'.1 A case study has also been described as an intensive, systematic investigation of a single individual, group, community or some other unit in which the researcher examines etc..
A discussion group is a group of individuals, typically who share a similar interest, who gather either formally or informally to discuss ideas, solve problems, or make comments.
A task or piece of work allocated to someone as part of a job or course of study.
"a homework assignment
A coding interview, programming interview or Microsoft interview is a technical problem-based job interview technique to assess potential employees. ... Coding interviews test candidates' technical knowledge, coding ability, problem solving skills, and creativity, typically on a whiteboard.
Dot Net is a software framework developed by Microsoft for building Windows applications. Connected architecture allows for seamless communication between different components of an application.
Dot Net provides a common runtime environment for different programming languages
Connected architecture enables easy integration of different modules and services
Example: A web application using Dot Net can easily communicate wi...
I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.
Planning a data center migration involves several key steps and considerations.
Assess the current data center infrastructure and identify the reasons for migration
Define the goals and objectives of the migration project
Create a detailed project plan with timelines, milestones, and resource allocation
Evaluate and select a new data center location based on factors like proximity, security, scalability, and cost
Develop a ...
Estimates are calculated by considering various factors such as project scope, resources, time, and risks.
Define the project scope and deliverables
Identify the required resources and their availability
Break down the project into smaller tasks
Estimate the effort required for each task
Consider any potential risks and uncertainties
Calculate the total effort and duration for the project
Review and adjust the estimates based
The mode used to migrate end users devices was a phased approach.
The migration was done in stages, with groups of end users being migrated at different times.
This approach allowed for better control and management of the migration process.
It also minimized disruption to end users by ensuring that not all devices were migrated simultaneously.
For example, the migration started with a pilot group of users to test the proc...
Server build involves the process of assembling and configuring hardware components to create a functional server.
Server build includes selecting appropriate hardware components such as CPU, RAM, storage devices, etc.
It also involves installing the operating system and necessary software on the server.
Configuration of network settings, security measures, and user access control is part of server build.
Server build may ...
Planning resources involves identifying and allocating the necessary personnel, equipment, and materials for a project.
Identify the project requirements and objectives
Determine the types and quantities of resources needed
Assess the availability and skills of existing resources
Allocate resources based on priority and project timeline
Consider resource constraints and potential risks
Monitor and adjust resource allocation
WBS stands for Work Breakdown Structure. It is a hierarchical decomposition of project deliverables into smaller, manageable components.
WBS helps in organizing and defining the scope of work for a project.
It breaks down complex projects into smaller, more manageable tasks.
WBS provides a visual representation of the project's structure and helps in understanding the dependencies between tasks.
It facilitates effective pr...
based on 1 review
Rating in categories
MIS Executive
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
IME Manager
3
salaries
| ₹4 L/yr - ₹6.3 L/yr |
TCS
Accenture
Wipro
Cognizant