Filter interviews by
I applied via AmbitionBox and was interviewed in Apr 2022. There were 3 interview rounds.
R.E. wall stands for Retaining Earth wall, which is a structure used to hold back soil or rock to prevent erosion or collapse.
R.E. wall is a type of retaining wall commonly used in civil engineering.
It is designed to resist the lateral pressure of the soil or rock behind it.
The wall is typically made of concrete or masonry and can be reinforced with steel bars.
It is used to prevent erosion, stabilize slopes, and create...
There are three types of R.E. walls: Gravity, Semi-Gravity, and Cantilever walls.
Gravity walls rely on their weight to resist pressure from behind.
Semi-gravity walls use both their weight and soil reinforcement to resist pressure.
Cantilever walls use a base slab and a stem to resist pressure.
Each type of wall has its own advantages and disadvantages depending on the site conditions.
R.E. walls are retaining walls used in civil engineering. There are various types of R.E. walls.
Gravity walls
Cantilever walls
Counterfort walls
Buttress walls
Gabion walls
Mechanically Stabilized Earth (MSE) walls
Soil Nailing walls
Tied-back walls
Anchored walls
Prefabricated walls
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Job Portal and was interviewed before May 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before May 2017. There were 4 interview rounds.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
posted on 11 May 2018
based on 15 reviews
Rating in categories
Site Engineer
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Maccaferri
Terram Geosynthetics
Techfab (India) Industries
J K Fenner