A circuit diagram is a visual representation of an electrical circuit showing how components are connected.
Circuit diagrams use symbols to represent components like resistors, capacitors, and transistors.
Lines represent wires connecting the components.
Arrows indicate the direction of current flow.
Circuit diagrams help engineers understand and troubleshoot circuits.
Example: A simple circuit diagram for a light bulb conn
Situational behaviour
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
IS stands for Indian Standard in strength of concrete and steel.
IS is a set of standards established by the Bureau of Indian Standards (BIS) for various materials used in construction.
IS codes provide guidelines for the quality, testing, and usage of materials like concrete and steel.
For example, IS 456 is the code for the design of plain and reinforced concrete structures, while IS 2062 is the code for steel used in g
The minimum floor level of building construction varies based on local building codes and regulations.
The minimum floor level is determined by the local building codes and regulations.
It is usually measured from the ground level to the top of the finished floor.
The minimum floor level may also depend on the type of building and its intended use.
For example, in flood-prone areas, the minimum floor level may be higher to...
Colour codes in building are used to identify different types of pipes, wires, and other building components.
Colour codes are used to ensure safety and efficiency in building construction and maintenance.
For example, red is often used to indicate electrical wires, while blue is used for water pipes.
Colour codes can also be used to indicate the function of a room or area, such as green for emergency exits.
It is importan...
There are several arc methods used in commercial building design.
Arc flash analysis
Arc fault circuit interrupters
Arc-resistant switchgear
Arc welding
Arc blast analysis
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of manufacturing processes.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
OEE helps identify areas for improvement in production processes.
For example, if a machine has an availability of 90%, performance of 80%, and qual
I applied via Campus Placement and was interviewed before Feb 2021. There were 5 interview rounds.
Basics of mathematics and physics
Basic electrics & electronics
I applied via Company Website and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I appeared for an interview in Aug 2024.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma aims to achieve near-perfect quality by identifying and eliminating causes of defects or errors.
It uses statistical tools and techniques to measure and analyze process performance.
The goal of Six Sigma is to reduce variation and improve efficiency, ultimately leading to cost savings and customer satisfaction.
Compa...
Implemented a kaizen to streamline production process, reducing lead time by 20%.
Identified bottlenecks in the production process
Implemented visual management tools to track progress
Trained team members on new processes and best practices
Absenteeism and attrition can be controlled through various strategies such as improving work culture, offering competitive benefits, and providing opportunities for growth.
Improve work culture by promoting work-life balance and creating a positive work environment.
Offer competitive benefits such as health insurance, flexible work hours, and performance bonuses.
Provide opportunities for growth and development through t...
The OE Calculation Formula is used to determine the efficiency of a process or system.
OE (Overall Equipment) = (Operating Time - Downtime) / Operating Time
Operating Time is the total time the equipment is available for production.
Downtime is the total time the equipment is not available for production.
OE value ranges from 0 to 1, with 1 indicating perfect efficiency.
Example: OE = (500 hours - 50 hours) / 500 hours = 0.
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
EV chargers are specific to the type of plug used by the vehicle. Common types include CHAdeMO, CCS, and Tesla Supercharger.
EV chargers are designed to match the plug type of the vehicle being charged
CHAdeMO is commonly used by Japanese automakers like Nissan and Mitsubishi
CCS is used by many European and American automakers
Tesla Superchargers are exclusive to Tesla vehicles
Other types of plugs include Type 1 and Type
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
41
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Junior Engineer
35
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Deputy Manager
31
salaries
| ₹8 L/yr - ₹16 L/yr |
Electrical Engineer
29
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
28
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Dixon Technologies
Secure Meters
Centum Electronics
Jabil Circuit India