Steer Engineering Assistant Manager Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Education and previous work details

Interview Preparation Tips

Interview preparation tips for other job seekers - Very friendly cooperation.

Interview Questionnaire 

4 Questions

  • Q1. What will you do when material is not received in time at site ?
  • Ans. 

    I will assess the situation and take necessary actions to minimize the impact on the project timeline.

    • Check with the supplier for the reason of delay and expected delivery date

    • Evaluate the impact on the project timeline and inform the project team

    • Explore alternative options such as sourcing from a different supplier or adjusting the project schedule

    • Communicate the revised plan to all stakeholders and ensure timely deli...

  • Answered by AI
  • Q2. How do you manage the team ?
  • Ans. Should maintain proper communication between team members. Good planning assists allocation of work responsibilities to team members, also it avoids irrational approach and duplication of works. As a best team player can complete the project within a specified time and budget.
  • Answered Anonymously
  • Q3. How do you calculate the cement and sand for 1 sqm cm 1:4?
  • Ans. 

    To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

    • The ratio of cement to sand is 1:4

    • Calculate the total volume of the mixture, which is 1 sqm cm

    • Divide the total volume by the sum of the ratio (1+4=5)

    • Multiply the quotient by the individual ratio to get the volume of cement and sand

    • Convert the volume to weight using the de

  • Answered by AI
  • Q4. What is price escalation?
  • Ans. 

    Price escalation refers to the increase in the price of goods or services over time.

    • It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.

    • Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.

    • For example, the price of gasoline may escalate due to an increase in the cost of c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are majorly from technical side as per your experience and civil Engineering subjects. Some of the questions related to IS Codes.

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is my strength?
  • Ans. 

    My strength is my ability to lead and motivate a team towards achieving goals.

    • Effective communication skills

    • Strong decision-making abilities

    • Ability to delegate tasks efficiently

    • Positive attitude towards challenges

    • Experience in managing teams

    • Motivational skills

    • Goal-oriented mindset

  • Answered by AI
  • Q2. What is my weakness?

Interview Preparation Tips

Topics to prepare for Ramky Infrastructure Assistant Manager interview:
  • Technicals
Interview preparation tips for other job seekers - Give interview confidently and they do a much of bargaining in salary. So stay in your demand.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Nothing just basic information and then they are conducting technical round based on your profile or department

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Rate analysis for building Items
  • Ans. 

    Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.

    • Rate analysis helps in determining the cost of each building item based on material and labor costs.

    • It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.

    • Rate analysis helps in estimating the total project cost accurately.

    • For ex...

  • Answered by AI
  • Q2. Material Rates of building materials
  • Ans. 

    Material rates of building materials vary based on factors like location, quality, and demand.

    • Material rates can vary based on the location of the construction site.

    • The quality of the building materials can also impact the rates.

    • Demand for certain materials can cause fluctuations in prices.

    • For example, the rate of cement in urban areas may be higher compared to rural areas.

    • Higher quality bricks may cost more than lower...

  • Answered by AI
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Procurement methodology
  • Q2. Explain the procurement process
  • Ans. 

    Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and receiving goods/services.

    • Identify the need for goods/services

    • Determine the specifications and quantity required

    • Select potential suppliers and issue a request for proposal (RFP)

    • Evaluate proposals and select a supplier

    • Negotiate contract terms and conditions

    • Place the order and receive the goods/services

    • Ensure timely payment and

  • Answered by AI
  • Q3. What is the risk and mitigations
  • Ans. 

    Risk refers to potential harm or loss. Mitigations are actions taken to reduce or eliminate the risk.

    • Identify potential risks and their impact

    • Develop a plan to mitigate risks

    • Implement the plan and monitor its effectiveness

    • Regularly review and update the plan

    • Examples: Risk of theft - install security cameras, Risk of low sales - increase marketing efforts

  • Answered by AI
  • Q4. What is the general payment terms
  • Ans. 

    The general payment terms vary depending on the vendor and the type of product or service being purchased.

    • Payment terms can range from net 30 to net 90 days

    • Some vendors may require partial payment upfront

    • Other vendors may offer discounts for early payment

    • Payment terms should be negotiated and agreed upon before making a purchase

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good organization , skilled peoples
Maximum question is based on the your current organization job and responsibilities
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Normal based on cv
Round 2 - One-on-one 

(1 Question)

  • Q1. Regarding contract

I applied via AmbitionBox

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Store Handling & Process

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer the questions with free.....

I applied via Referral and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
Round 3 - Technical 

(1 Question)

  • Q1. About process and total experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be attentive. Always provide answer to the point. Explain your full experience in good and accurate manner. You need to provide full and constrictive information about your process/operation knowledge

Steer Engineering Interview FAQs

How to prepare for Steer Engineering Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Steer Engineering. The most common topics and skills that interviewers at Steer Engineering expect are AutoCAD, Solid Works, Ansys, Machine Design and Manufacturing Process.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tractebel Interview Questions
4.1
 • 42 Interviews
View all
Steer Engineering Assistant Manager Salary
based on 23 salaries
₹6.5 L/yr - ₹12 L/yr
At par with the average Assistant Manager Salary in India
View more details

Steer Engineering Assistant Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

1.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Design Engineer
53 salaries
unlock blur

₹2.4 L/yr - ₹6.8 L/yr

Assistant Manager
23 salaries
unlock blur

₹6.5 L/yr - ₹12 L/yr

Junior Engineer
22 salaries
unlock blur

₹2 L/yr - ₹3.8 L/yr

Quality Engineer
17 salaries
unlock blur

₹2.5 L/yr - ₹4.1 L/yr

Deputy Manager
17 salaries
unlock blur

₹8.6 L/yr - ₹11.2 L/yr

Explore more salaries
Compare Steer Engineering with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation