Starworth Infrastructure Construction
Samyak Infotech Interview Questions and Answers
Q1. What are the requirements for Basic calculations for billing and quantity survey
Basic calculations for billing and quantity survey require accurate measurements, unit rates, quantities, and labor costs.
Accurate measurements of dimensions and quantities are essential
Unit rates for materials and labor must be determined
Labor costs need to be calculated based on the quantity of work done
Total cost is calculated by multiplying the quantity by the unit rate
Q2. How to maintain qualtity and quantity
Maintaining quality and quantity involves setting clear standards, regular monitoring, effective communication, and continuous improvement.
Establish clear quality and quantity standards for products or services
Regularly monitor production processes to ensure adherence to standards
Communicate expectations and provide feedback to employees
Implement quality control measures such as inspections and audits
Continuously seek ways to improve processes and efficiency
Q3. What is the code we use for measurement
The code used for measurement is typically based on industry standards and guidelines.
Common measurement codes include ASTM (American Society for Testing and Materials), ISO (International Organization for Standardization), and ASME (American Society of Mechanical Engineers)
Each code provides specific guidelines for measuring different aspects of a project or product
For example, ASTM D792 is used for measuring the density of plastics
Q4. What is the wastage limit of steel
The wastage limit of steel varies depending on the project requirements and specifications.
The wastage limit of steel is typically around 2-3% in construction projects.
However, some projects may have stricter wastage limits depending on the budget and design requirements.
It is important for billing engineers to accurately estimate the required amount of steel to minimize wastage and cost overruns.
Q5. Process of finsihing items in flats
Finishing items in flats involves completing the final touches and details to prepare the items for use or display.
Inspecting for any defects or imperfections
Cleaning and polishing surfaces
Applying protective coatings or finishes
Assembling any additional components
Packaging for shipment or display
Q6. Methodology of various waterproofing
Various waterproofing methodologies include membrane waterproofing, cementitious waterproofing, crystalline waterproofing, and bituminous waterproofing.
Membrane waterproofing involves applying a thin layer of waterproof material over the surface.
Cementitious waterproofing uses cement-based materials to create a barrier against water penetration.
Crystalline waterproofing involves chemicals that react with water to form crystals, blocking water entry.
Bituminous waterproofing us...read more
Q7. Unit of measurements
Unit of measurements are used to quantify physical quantities in various fields.
Units of measurements include length (meter), mass (kilogram), time (second), temperature (kelvin), etc.
Different industries may use different units of measurements, such as square feet in construction or gallons in liquid measurements.
Units can be converted using conversion factors, such as 1 meter = 3.28 feet.
Interview Process at Samyak Infotech
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month