Upload Button Icon Add office photos

Filter interviews by

Sri Sreenivasa Constructions Interview Questions and Answers

Updated 9 Oct 2024

Sri Sreenivasa Constructions Interview Experiences

8 interviews found

Project Manager Interview Questions & Answers

user image SATHESHKUMAR . L

posted on 9 Oct 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Questions asked rudely
  • Q2. Whether you want job or not
  • Ans. 

    I am interested in the job and believe I am a strong fit for the role.

    • I am passionate about project management and have relevant experience.

    • I am excited about the opportunity to contribute to the team and achieve project goals.

    • I am confident in my ability to lead and organize projects effectively.

  • Answered by AI

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Questionnaire 

5 Questions

  • Q1. What are the type of grades of concrete?
  • Ans. 

    The grades of concrete refer to the strength and quality of the concrete mixture.

    • The most common grades of concrete are M10, M15, M20, M25, M30, M35, M40, M45, M50, M55, M60, and M70.

    • The grade of concrete is determined by the ratio of cement, sand, and aggregate used in the mixture.

    • Higher grade concrete has a higher compressive strength and is used for heavy-duty structures like bridges and high-rise buildings.

    • Lower gr...

  • Answered by AI
  • Q2. In M20,what is M and what is 20?
  • Ans. 

    M20 refers to a specific model or version of something.

    • M represents the model or version designation.

    • 20 indicates the specific model number or version.

    • It could be related to various fields like technology, automobiles, or products.

    • Examples: M20 could be a smartphone model, a car model, or a software version.

  • Answered by AI
  • Q3. What are the factors that one should keep in mind while desinging a mix?
  • Ans. 

    Factors to consider when designing a mix

    • Identify the target audience and their preferences

    • Consider the purpose and context of the mix

    • Balance the different elements of the mix (e.g., vocals, instruments)

    • Ensure proper levels and panning for each element

    • Pay attention to the frequency spectrum and EQ each element accordingly

    • Use effects and dynamics processing to enhance the mix

    • Consider the overall dynamics and flow of the ...

  • Answered by AI
  • Q4. Type of dams and example for each type type of soils, what is liquid limit, plastic limit,what is safe bearing capacity?
  • Ans. 

    Types of dams include gravity dams, arch dams, and embankment dams. Liquid limit and plastic limit are soil properties. Safe bearing capacity is the maximum load a soil can support.

    • Types of dams: gravity dams (e.g. Hoover Dam), arch dams (e.g. Glen Canyon Dam), embankment dams (e.g. Three Gorges Dam)

    • Liquid limit: the moisture content at which a soil transitions from a liquid to a plastic state

    • Plastic limit: the moistur...

  • Answered by AI
  • Q5. What is the purpose of canal lining?
  • Ans. 

    Canal lining is done to prevent water seepage and erosion, and to improve water flow efficiency.

    • Prevents water seepage and erosion

    • Improves water flow efficiency

    • Reduces water loss due to seepage

    • Prevents soil erosion along the canal banks

    • Increases the lifespan of the canal

    • Helps in maintaining a consistent water supply

  • Answered by AI

Interview Preparation Tips

General Tips: Concentrate more on your basics.especially strength of materials, RCC, concrete technology, soil mechanics.
College Name: NIT WARANGAL

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Questionnaire 

4 Questions

  • Q1. Diffentiate between the fine aggregate and coarse aggregate ?
  • Q2. What is clay and silt ?
  • Q3. What is proctor test ?
  • Q4. What is phreatic line

Interview Preparation Tips

General Tips: This company is very easy to get,if you are through about your fundamentals.
College Name: NIT WARANGAL

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Preparation Tips

Round: Technical Interview
Experience: Main basic knowledge of our mtech subjects, and mainly Earth dams .

Round: HR Interview
Experience: My name, UG compltion year, % in UG ,about my UG project work .

General Tips: Well prepare basic knowledge and practical knowledge, and not disspointed in not selected in interview that's basic for another good company and tell them be confidence and All The Best
College Name: NIT WARANGAL

Sri Sreenivasa Constructions interview questions for popular designations

 Project Manager

 (1)

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Questionnaire 

5 Questions

  • Q1. How to construct mohr circle ?
  • Q2. What are soils used in earth dam & explain friction circle method ?
  • Q3. What is priniciple plane ?
  • Q4. How much percantage got in btech&mtech?
  • Q5. Some questions are asked on experience?

Interview Preparation Tips

General Tips: Main technical subject necessary..
College Name: NIT WARANGAL

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Preparation Tips

Round: Technical Interview
Experience: At first they asked about experience based on that they asked the questions. 1.How u will select the grade of concrete for rigid pavement? 2.After fixing the grade of concrete what is the next step, How you will proceed ,what is maximum size of aggregate? 3.How do u check the workability? then they asked about the earth dams, seepage pressure,What is phreatic line,corrections for it, exit gradient,equipotential line,what type of compaction equipment you will use for diff type of soils etc

Round: HR Interview
Experience: Name ,Btech college name,% in Btech, Native,Current cgpa in Mtech,experience,nature of work etc

General Tips: Well prepared with basic knowledge,experience is enough,cgpa also be one criteria for selection
College Name: NIT WARANGAL

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Questionnaire 

11 Questions

  • Q1. What are the structures constructed across an irrigation canal ?
  • Q2. When does the hydraulic jump occurs ?
  • Q3. What is meant by frouds number ?
  • Q4. What is exit gradient ?
  • Q5. What are the limitions of staad in case of no of stories in a building ?
  • Q6. Define contour and ridge canal ?
  • Q7. Which type of flow is hydraulic jump ?
  • Q8. What is the condition to form a hydraulic jump ?
  • Q9. When did you completed u r B.tech ?
  • Q10. What is your college name and where is it located ?
  • Q11. What is % in both M.tech & B.tech ?

Interview Preparation Tips

College Name: NIT WARANGAL

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2015

Interview Questionnaire 

14 Questions

  • Q1. What is your favorite subject ?
  • Ans. 

    My favorite subject is mathematics.

    • I enjoy solving complex equations and problems.

    • I find it satisfying to arrive at a correct answer after working through a difficult problem.

    • I appreciate the logical and analytical thinking skills that mathematics requires.

    • I also enjoy the creativity involved in finding different approaches to solving a problem.

    • Some of my favorite topics within mathematics include calculus, linear alge

  • Answered by AI
  • Q2. Types of spillways ?
  • Ans. 

    Spillways are structures used to control the flow of water in dams and reservoirs. There are several types of spillways.

    • Overflow spillway

    • Chute spillway

    • Siphon spillway

    • Side channel spillway

    • Bell-mouth spillway

    • Morning glory spillway

    • Fuse plug spillway

    • Shaft spillway

  • Answered by AI
  • Q3. River Hydrology ?
  • Q4. What are the types of cross drainage works ?
  • Ans. 

    Cross drainage works are structures built to allow water to flow under a transportation route.

    • Culverts - pipes or concrete boxes that allow water to flow under a roadway

    • Bridges - structures that allow water to flow under a roadway or railway

    • Siphons - pipes that allow water to flow under a transportation route while maintaining a constant flow

    • Aqueducts - structures that carry water over a transportation route

    • Weirs - str...

  • Answered by AI
  • Q5. What is meant by canal regulator ?
  • Ans. 

    A canal regulator is a structure used to control the flow of water in a canal.

    • Canal regulators are used to maintain a consistent water level in a canal.

    • They can be manually operated or automated.

    • Examples of canal regulators include gates, weirs, and sluices.

    • Canal regulators are important for irrigation, navigation, and flood control.

  • Answered by AI
  • Q6. What are the uses of multipurpose projects ?
  • Ans. 

    Multipurpose projects have various uses such as irrigation, hydroelectric power generation, flood control, and recreation.

    • Irrigation for agriculture

    • Hydroelectric power generation

    • Flood control to prevent damage

    • Recreation for tourism

    • Water supply for domestic and industrial use

    • Navigation for transportation

    • Fisheries for commercial and recreational purposes

  • Answered by AI
  • Q7. What is syllabus in M.tech ?
  • Ans. 

    Syllabus in M.tech is a detailed outline of the topics and subjects that will be covered in the course.

    • Syllabus includes course objectives, learning outcomes, and assessment methods.

    • It outlines the topics and subtopics that will be covered in each course module.

    • Syllabus also includes recommended textbooks, reference materials, and assignments.

    • It is important for students to review the syllabus to understand the expecta...

  • Answered by AI
  • Q8. Time of concentration ?
  • Ans. 

    Time of concentration is the time taken for water to travel from the farthest point in a watershed to the outlet.

    • It is used in hydrology to estimate peak flow rates and design stormwater management systems.

    • It depends on factors such as slope, soil type, land use, and drainage patterns.

    • Longer time of concentration means slower runoff and smaller peak flows.

    • Shorter time of concentration means faster runoff and larger pea...

  • Answered by AI
  • Q9. What is unit hydro graph ?
  • Ans. 

    Unit hydrograph is a hydrological tool that represents the response of a watershed to a unit of rainfall.

    • It is a graph that shows the relationship between the rainfall input and the resulting runoff output.

    • It is used to predict the flow rate of a river or stream during a storm event.

    • It assumes that the rainfall is evenly distributed over the watershed and that the runoff response is linear.

    • It is often used in flood for...

  • Answered by AI
  • Q10. What is meant by project economics and describe it ?
  • Ans. 

    Project economics refers to the financial analysis of a project to determine its viability and profitability.

    • It involves analyzing the costs and benefits of a project

    • Factors such as capital costs, operating costs, revenue, and cash flow are considered

    • The goal is to determine if the project will generate a positive return on investment (ROI)

    • If the ROI is positive, the project is considered economically viable

    • If the ROI ...

  • Answered by AI
  • Q11. When did you completed your B.tech ?
  • Ans. 

    I completed my B.tech in May 2019.

    • Completed B.tech in May 2019

    • Graduated from XYZ University

    • Major in Computer Science Engineering

  • Answered by AI
  • Q12. Which college did you completed your B.tech ?
  • Ans. 

    I completed my B.tech from XYZ College.

    • I pursued my B.tech from XYZ College.

    • I graduated from XYZ College with a B.tech degree.

    • My alma mater for B.tech is XYZ College.

    • I completed my engineering degree from XYZ College.

  • Answered by AI
  • Q13. What is your native place ?
  • Q14. % of B.TECH & M.TECH ?
  • Ans. 

    The percentage of B.Tech and M.Tech students is not provided.

    • Data on the percentage of B.Tech and M.Tech students is not available.

    • Cannot answer without the required data.

  • Answered by AI

Interview Preparation Tips

General Tips: Be through your fundamentals of the respective discipline and be confident while facing the panel .
College Name: NIT WARANGAL

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the OSHA standards applicable to building construction?
  • Ans. 

    OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.

    • Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.

    • Hazard communication standards require employers to provide information about hazardous chemicals used on site.

    • Scaffolding safety regulations cover proper construction, use, and maintenan...

  • Answered by AI
  • Q2. What are the AISC codes applicable to steel structures?
  • Ans. 

    AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.

    • AISC 360 - Specification for Structural Steel Buildings

    • AISC 341 - Seismic Provisions for Structural Steel Buildings

  • Answered by AI

Sri Sreenivasa Constructions Interview FAQs

How many rounds are there in Sri Sreenivasa Constructions interview?
Sri Sreenivasa Constructions interview process usually has 1 rounds. The most common rounds in the Sri Sreenivasa Constructions interview process are One-on-one Round.
How to prepare for Sri Sreenivasa Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sri Sreenivasa Constructions. The most common topics and skills that interviewers at Sri Sreenivasa Constructions expect are Civil Engineering and Construction Engineering.
What are the top questions asked in Sri Sreenivasa Constructions interview?

Some of the top questions asked at the Sri Sreenivasa Constructions interview -

  1. Type of dams and example for each type type of soils, what is liquid limit, pla...read more
  2. What are the limitions of staad in case of no of stories in a buildin...read more
  3. What are the factors that one should keep in mind while desinging a m...read more

Tell us how to improve this page.

Sri Sreenivasa Constructions Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Sri Sreenivasa Constructions Reviews and Ratings

based on 48 reviews

3.4/5

Rating in categories

3.8

Skill development

3.4

Work-life balance

3.3

Salary

3.4

Job security

3.4

Company culture

3.1

Promotions

3.7

Work satisfaction

Explore 48 Reviews and Ratings
Civil Site Engineer
20 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Site Engineer
12 salaries
unlock blur

₹2.5 L/yr - ₹8 L/yr

Civil Engineer
7 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Senior Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹4.8 L/yr

Project Engineer
5 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Explore more salaries
Compare Sri Sreenivasa Constructions with

Lea Associates South Asia

4.3
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare

Nesma & Partners

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview