Filter interviews by
Communication skills
General discussion working principles
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
I faced a difficult situation when a critical project deadline was approaching and we encountered unexpected technical issues.
Technical issues arose during a critical project
Deadline was approaching
Had to find quick solutions to resolve the issues
Coordinated with team members to troubleshoot and fix the problems
Implemented contingency plans to ensure project completion on time
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
I appeared for an interview before Feb 2024.
I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.
I am a highly experienced and skilled Executive Engineer with a proven track record of successfully managing large-scale projects.
Over 10 years of experience in engineering and project management
Strong leadership skills and ability to effectively communicate with team members and stakeholders
Successfully completed projects such as the construction of a new bridge and the renovation of a major highway
I applied via Recruitment Consultant and was interviewed in Feb 2020. There was 1 interview round.
VCB stands for Vacuum Circuit Breaker, which is an electrical switch that uses vacuum as the dielectric medium.
VCB is used to protect electrical equipment from damage caused by overcurrents and short circuits.
It is commonly used in high voltage power systems.
VCBs are more reliable and require less maintenance compared to other types of circuit breakers.
They are also more environmentally friendly as they do not use any ...
DG stands for Diesel Generator, which is a backup power source used in case of power outages.
DG is a standalone power source that runs on diesel fuel.
It is commonly used as a backup power source in case of power outages.
DGs are often used in hospitals, data centers, and other critical facilities to ensure uninterrupted power supply.
They come in various sizes and capacities, depending on the power requirements of the fa...
DC motors convert electrical energy into mechanical energy through the interaction of magnetic fields.
DC motors have a stationary part called the stator and a rotating part called the rotor.
The stator contains the field windings that produce a magnetic field, while the rotor has the armature windings that carry the current.
The interaction of the magnetic fields causes the rotor to rotate, producing mechanical energy.
DC...
PLC stands for Programmable Logic Controller, a digital computer used for automation of electromechanical processes.
PLCs are used in industrial automation to control machinery and processes
They are programmed using ladder logic or other programming languages
PLCs can communicate with other devices and systems through various communication protocols
Examples of PLC applications include manufacturing, transportation, and b
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
Site execution and installation guidelines ensure successful project completion.
Develop a detailed plan for site execution and installation
Ensure all necessary permits and approvals are obtained
Conduct regular inspections and quality checks
Maintain clear communication with all stakeholders
Provide adequate training and support for installation teams
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Executive
129
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Senior Chemist
118
salaries
| ₹2.6 L/yr - ₹5.5 L/yr |
Officer
110
salaries
| ₹2.6 L/yr - ₹6.5 L/yr |
Chemist
96
salaries
| ₹1.6 L/yr - ₹4.3 L/yr |
Senior Executive
66
salaries
| ₹5.7 L/yr - ₹9.2 L/yr |
Hetero
Micro Labs
Biological E
USV