Filter interviews by
What is the permissible fraction of pentane in natural gas before liquefaction?
The facility process involves controlling and monitoring various systems using a DCS panel.
The DCS panel operator is responsible for monitoring and controlling various systems such as boilers, turbines, and generators.
They must ensure that the systems are operating within safe parameters and take corrective action if necessary.
The operator must also communicate with other operators and maintenance personnel to ensure s...
The regeneration column can be stabilized by controlling the temperature, pressure, and flow rate of the feed and regeneration streams.
Maintain a consistent temperature in the column
Control the pressure to prevent fluctuations
Adjust the flow rate of the feed and regeneration streams
Monitor the column for any changes in performance
Make adjustments as necessary to maintain stability
I applied via Company Website and was interviewed before Oct 2022. There were 2 interview rounds.
There are several types of horizontal wells, including simple, multilateral, extended reach, and complex wells.
Simple horizontal wells are the most basic type, drilled horizontally from a vertical wellbore.
Multilateral horizontal wells have multiple lateral branches extending from the main wellbore.
Extended reach horizontal wells are drilled to reach distant reservoirs from a single location.
Complex horizontal wells in...
Different types of stuck pipe include differential sticking, mechanical sticking, and wellbore geometry issues.
Differential sticking occurs when the drill pipe becomes stuck in permeable formations due to differential pressure causing the pipe to stick to the formation.
Mechanical sticking happens when the pipe gets stuck due to wellbore conditions such as tight spots, keyseats, or doglegs.
Wellbore geometry issues can l...
Rigging out a bit involves removing the drill bit from the rig floor.
Ensure the rig floor is clear of any obstructions before rigging out the bit.
Use proper lifting equipment to safely remove the bit from the rig floor.
Inspect the bit for any damage or wear before storing it properly.
Document the rig out process in the drilling report for future reference.
Selecting the right bit for a formation involves considering the formation type, drilling parameters, and bit design.
Consider the type of formation being drilled (e.g. soft, hard, abrasive)
Evaluate the drilling parameters such as weight on bit, rotary speed, and mud properties
Choose a bit design that is suitable for the specific formation characteristics
To pressure test a BOP, follow proper procedures, use appropriate equipment, monitor pressure levels, and record results.
Ensure all connections are secure before pressurizing the BOP
Gradually increase pressure to the specified level and hold for the required time
Monitor pressure gauges and watch for any leaks or abnormalities
Record the pressure test results for documentation and analysis
SONATRACH interview questions for popular designations
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
What do you know about the oil and gas activity? write an essay on how to contribute to improve business efficiency.
What do you know about the company? What do you expect from the company aside wages?
I appeared for an interview before Jul 2016.
I applied via Newspaper Ad and was interviewed before Mar 2021. There were 2 interview rounds.
Hi
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
Normal GD.Just brush up contemporary topics
based on 7 interviews
Interview experience
based on 109 reviews
Rating in categories
Mechanical Engineer
5
salaries
| ₹1 L/yr - ₹7.5 L/yr |
DCS Panel Operator
4
salaries
| ₹12 L/yr - ₹28 L/yr |
Oil And Natural Gas Corporation
Reliance Industries
Bharat Petroleum
Hindustan Petroleum