Filter interviews by
Top trending discussions
I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.
There are several types of surveys, and the first survey is typically a baseline survey.
There are various types of surveys such as customer satisfaction surveys, employee engagement surveys, market research surveys, etc.
The first survey is often a baseline survey, which establishes a starting point for future comparisons or measurements.
Baseline surveys are conducted to gather initial data or establish benchmarks befor...
The number of pegs required to mark for A-type foundation depends on the specific requirements of the project.
The number of pegs required may vary based on the size and shape of the foundation.
The complexity of the design and the presence of any additional features can also affect the number of pegs needed.
It is important to consult the project plans and specifications to determine the exact number of pegs required.
For...
The amount of cement required for a tower foundation RCC depends on various factors such as the size and height of the tower, soil conditions, and design specifications.
The quantity of cement is determined by the volume of concrete required for the foundation.
The volume of concrete is calculated by multiplying the length, width, and height of the foundation.
The cement content in concrete is typically expressed as a per...
The question is unclear and does not make sense.
The question seems to be incomplete or incorrectly phrased.
It is unclear what is meant by 'Tower foundation line up to see'.
There is not enough information provided to answer the question.
It is recommended to seek clarification or ask for more details.
The working point for foundation refers to the specific goals and objectives that the foundation aims to achieve.
The working point for foundation is determined by its mission and vision.
It includes the specific areas or issues the foundation focuses on.
For example, a foundation working on education may have a working point of improving literacy rates in underprivileged communities.
The working point may also include the...
The tools required for tower foundation include concrete mixers, rebar cutters, excavators, and leveling instruments.
Concrete mixers are used to mix the concrete for the foundation.
Rebar cutters are necessary to cut and shape the reinforcement bars.
Excavators are used to dig the foundation hole and remove excess soil.
Leveling instruments such as laser levels or spirit levels are used to ensure the foundation is level a
posted on 10 Feb 2018
The star delta starter is a method used to reduce the starting current of induction motors.
Star delta starter is used for motors with high starting current
It involves starting the motor in star connection and then switching to delta connection
Reduces the voltage across the motor windings during starting
Reduces the starting current by a factor of 1/√3
Commonly used in industries for large motors
In Diploma, students learn theoretical and practical knowledge related to electrical engineering.
Basic electrical principles and laws
Circuit analysis and design
Electrical machines and power systems
Control systems and automation
Electronics and communication
Practical skills like wiring, troubleshooting, and maintenance
Safety regulations and standards
Project work and internships
I applied via Campus Placement and was interviewed before Nov 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2021. There was 1 interview round.
Closing process involves finalizing financial transactions and preparing financial statements.
Reviewing and reconciling accounts
Adjusting entries
Preparing financial statements
Closing temporary accounts
Posting closing entries
Preparing post-closing trial balance
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jun 2022. There were 3 interview rounds.
Interview with US engineer ,....
based on 2 reviews
Rating in categories
Junior Engineer
13
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Operation & Maintenance Engineer
11
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Engineer
10
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Electrical Engineer
9
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Site Engineer
7
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Jyoti Structures
Aqua Tech Systems
Swastik Enterprises
Ecolibrium Energy