Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Top trending discussions
posted on 2 Apr 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2020. There was 1 interview round.
Implemented new quality control measures to reduce defects and improve product reliability.
Introduced a new inspection process to catch defects earlier
Trained employees on proper quality control techniques
Updated equipment to improve accuracy and precision
Collaborated with suppliers to ensure consistent quality of raw materials
I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.
I have 5 years of experience working as a mechanical engineer in the automotive industry.
Designed and implemented new components for vehicle engines
Performed stress analysis and simulations to ensure product durability
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Managed projects from concept to production, meeting strict deadlines
I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a residential building.
Designed a new software system for a manufacturing company to streamline production processes
Implemented a renewable energy solution for a residential building to reduce energy costs and environmental impact
Collaborated with a team of engineers t...
posted on 12 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.
Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Led a team of engineers to successfully launch a new product line
The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.
Typically led by a Toolroom Manager who oversees the operations
Toolmakers and machinists report to the Toolroom Manager
May have specialized teams for different types of tools or machinery
Collaborates closely with engineering and production departments
Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.
Regularly clean molds to prevent buildup of residue or contaminants
Inspect molds for wear and tear, cracks, or other damage
Repair any issues found during inspection to ensure molds function properly
Store molds properly when not in use to prevent damage or contamination
Encourage a positive culture that fosters the development of new ideas and activities for improvement.
Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.
Corrective action is reactive, addressing problems that have already occurred.
Preventive action is proactive, aiming to prevent problems from happening in the first place.
Corrective action focuses on fixing the root cause of a problem.
Preventive action focuses on identifying and eliminating ...
Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is scheduled at regular intervals to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is time-based, while predictive maintenance is c...
Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.
Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.
It can lead to increased downtime and production losses.
This type of maintenance is usually more costly compared to preventive maintenance.
Examples include fixing a machine only when it stops working or repairing a vehicle
The frequency of preventive maintenance varies depending on the equipment and industry standards.
Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.
Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.
Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...
Lifter pad and lifter are different components used in mechanical systems.
Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.
Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.
Lifter pads are stationary and provide a stable base for lifting, while...
The frequency of tool life refers to how often a tool needs to be replaced or maintained.
Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.
Higher cutting speeds or harder materials may require more frequent tool changes.
Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
167
salaries
| ₹5.1 L/yr - ₹12.6 L/yr |
Senior Engineer
120
salaries
| ₹4 L/yr - ₹7.8 L/yr |
Junior Engineer
115
salaries
| ₹1.5 L/yr - ₹4.4 L/yr |
Deputy Manager
82
salaries
| ₹6.5 L/yr - ₹16.2 L/yr |
Senior Executive
78
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti