Sintex Industries Utility Engineer Interview Questions and Answers

Updated 12 Jul 2017

Sintex Industries Utility Engineer Interview Experiences

1 interview found

Utility Engineer Interview Questions & Answers

user image Shrikant Soni

posted on 12 Jul 2017

I appeared for an interview in Apr 2017.

Interview Questionnaire 

2 Questions

  • Q1. Process and line diagrams
  • Q2. Full technical and deep knowledge questions

Interview Preparation Tips

Round: Technical Interview
Experience: Easy going and i keep my time to elaborate all the things to interviewer and answer the questions very quickly
Tips: You have to be a badic knowledge

Interview questions from similar companies

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.

I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Sourcing and Vendor development related

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical of ZBC and Manufacturing process.

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.
Round 1 - One-on-one 

(1 Question)

  • Q1. Questions will be mostly related to work experience
Round 2 - HR 

(1 Question)

  • Q1. Salary discussions and benefits

Interview Preparation Tips

Interview preparation tips for other job seekers - reference are more preferred. so try that way rather directly applying
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Ask machine knowledge

I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basic of fabrication, materials welding processes, distortion control methods, lifting techniques
  • Q2. Telephonic conversation regarding basics of welding and material properties
  • Q3. Interview with a panel of 4 judges
  • Q4. Salary negotiation notice period etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared. Be honest. Say no if you don't know the answer instead of guessing or pretending
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Salary expectations, notice period.
Round 2 - Technical 

(1 Question)

  • Q1. Calibration, process , Dcs, logic
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the process of erection of duct
  • Ans. 

    The process of erection of duct involves planning, fabrication, transportation, installation, and testing.

    • Planning involves determining the layout, size, and material of the ducts.

    • Fabrication includes cutting, bending, and assembling the ducts according to the design.

    • Transportation is the movement of fabricated ducts to the installation site.

    • Installation involves positioning and connecting the ducts to the HVAC system.

    • ...

  • Answered by AI
  • Q2. What is the code followed for the fabrication of steel structure materials
  • Ans. 

    The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.

    • The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.

    • Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.

    • Fabrication processes must also ...

  • Answered by AI
  • Q3. Erection sequence of steel structure
  • Ans. 

    The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.

    • Start by assembling the foundation and anchor bolts.

    • Next, erect the columns and connect them to the foundation.

    • Then, install the beams and trusses to form the framework.

    • After that, add the bracing and diagonal members for stability.

    • Finally, complete the structure by ad...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the Erection sequence of ESP ?
  • Ans. 

    The erection sequence of ESP involves several steps to ensure proper installation and functioning.

    • 1. Prepare the foundation for the ESP unit.

    • 2. Install the support structure for the ESP.

    • 3. Assemble the ESP components such as the casing, electrodes, and rapping system.

    • 4. Connect the necessary electrical and mechanical components.

    • 5. Test the ESP system for proper functioning before commissioning.

    • 6. Commission the ESP sys...

  • Answered by AI
  • Q2. Name of manufactures of various ESP materials supplier
  • Ans. 

    Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.

    • Schlumberger

    • Baker Hughes

    • Halliburton

    • Weatherford

    • National Oilwell Varco

  • Answered by AI

Sintex Industries Interview FAQs

How to prepare for Sintex Industries Utility Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sintex Industries. The most common topics and skills that interviewers at Sintex Industries expect are HVAC Equipments, Inspection and Utility Maintenance.
What are the top questions asked in Sintex Industries Utility Engineer interview?

Some of the top questions asked at the Sintex Industries Utility Engineer interview -

  1. Full technical and deep knowledge questi...read more
  2. Process and line diagr...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 258 Interviews
ABB Interview Questions
4.1
 • 241 Interviews
Atlas Copco Interview Questions
4.2
 • 79 Interviews
View all
Executive
93 salaries
unlock blur

₹2.3 L/yr - ₹5.7 L/yr

Senior Executive
87 salaries
unlock blur

₹3.5 L/yr - ₹7.2 L/yr

Deputy Manager
60 salaries
unlock blur

₹5.5 L/yr - ₹11 L/yr

Assistant Manager
44 salaries
unlock blur

₹4.8 L/yr - ₹8.5 L/yr

Junior Executive
36 salaries
unlock blur

₹1.2 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Sintex Industries with

Thermax Limited

4.1
Compare

ABB

4.1
Compare

Tractors and Farm Equipment

4.0
Compare

Isgec Heavy Engineering

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview