Upload Button Icon Add office photos

Filter interviews by

Singh Construction Interview Questions, Process, and Tips

Updated 25 Oct 2024

Top Singh Construction Interview Questions and Answers

View all 7 questions

Singh Construction Interview Experiences

Popular Designations

3 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. How to handle customer who negotiate
  • Ans. 

    Handle customer negotiations by listening, understanding their needs, offering alternatives, and finding a win-win solution.

    • Listen actively to the customer's needs and concerns

    • Understand the customer's priorities and objectives

    • Offer alternatives or compromises to meet both parties' needs

    • Negotiate in good faith to find a win-win solution

    • Maintain a positive and professional attitude throughout the negotiation process

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Plan situational base

Operations Manager Interview Questions asked at other Companies

Q1. That, if a student, who passed 12th and doesn't want to study further so how would you convince him to study more
View answer (5)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Jan 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Grade of concrete and uses
  • Ans. 

    Grade of concrete refers to its strength and durability. Different grades are used for different purposes.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • For example, M20 means the concrete has a compressive strength of 20 megapascals (MPa).

    • Higher grades of concrete are used for structures that require greater strength and durability, such as bridges and high-rise buildings.

    • Lower grades of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - We happy and be concise and precise

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

I applied via Referral and was interviewed before Jan 2019. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Full from of TMT, Ans- Thermo Mechanically Treated
  • Ans. 

    TMT stands for Thermo Mechanically Treated.

    • TMT is a process of treating steel bars to increase their strength and durability.

    • It involves heating the steel bars to a high temperature and then rapidly cooling them in water.

    • This process changes the internal structure of the steel and makes it stronger.

    • TMT bars are commonly used in construction for their high strength and resistance to corrosion.

    • TMT bars are also more flex...

  • Answered by AI
  • Q2. 1m = ? Foot. Ans- 3.28 foot
  • Q3. Formula to calculate wt. Of steel ans- (dia.x dia.) ÷ 162
  • Ans. 

    Formula to calculate weight of steel based on diameter

    • Formula: (dia. x dia.) ÷ 162

    • dia. refers to the diameter of the steel

    • 162 is a constant used in the formula

    • The result will be in kg/metre

    • Example: For a steel with diameter of 10mm, weight would be (10 x 10) ÷ 162 = 0.617 kg/metre

  • Answered by AI
  • Q4. Cum to cft conversion multiple. Ans- 35.28
  • Ans. 

    Cum to cft conversion multiple is 35.28.

    • Cum is a unit of volume measurement used in the shipping industry.

    • Cft stands for cubic feet, a unit of volume measurement used in various industries.

    • To convert cum to cft, multiply the value in cum by 35.28.

    • For example, 1 cum = 35.28 cft.

  • Answered by AI
  • Q5. 1 inch = ? Foot. Ans- 1/12= 0.08 foot
  • Ans. 

    1 inch is equal to 0.08 foot.

    • 1 inch = 1/12 foot

    • 1 foot = 12 inches

    • Conversion between inches and feet is important in engineering and construction.

    • Knowing the conversion factor helps in accurate measurements and calculations.

  • Answered by AI
  • Q6. Size of course aggregate ? Ans- 10mm and 20 mm
  • Ans. 

    The size of course aggregate for the Trainee Engineer position is 10mm and 20mm.

    • Course aggregate refers to the crushed stone, gravel, or sand used in construction.

    • The size of the aggregate affects the strength and durability of the concrete.

    • 10mm and 20mm are common sizes used in construction projects.

    • The choice of aggregate size depends on the specific requirements of the project.

    • Other factors that may influence the ch...

  • Answered by AI
  • Q7. Know how on Current construction trends ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Answers May be right or wrong but be confident while answering them

Engineer Trainee Interview Questions asked at other Companies

Q1. If 10 people had a meeting and they shake hands only once with each of the others, then how many handshakes will be there in total ?
View answer (8)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the OSHA standards applicable to building construction?
  • Ans. 

    OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.

    • Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.

    • Hazard communication standards require employers to provide information about hazardous chemicals used on site.

    • Scaffolding safety regulations cover proper construction, use, and maintenan...

  • Answered by AI
  • Q2. What are the AISC codes applicable to steel structures?
  • Ans. 

    AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.

    • AISC 360 - Specification for Structural Steel Buildings

    • AISC 341 - Seismic Provisions for Structural Steel Buildings

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI

Singh Construction Interview FAQs

How many rounds are there in Singh Construction interview?
Singh Construction interview process usually has 1-2 rounds. The most common rounds in the Singh Construction interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Singh Construction interview?

Some of the top questions asked at the Singh Construction interview -

  1. formula to calculate wt. Of steel ans- (dia.x dia.) ÷ ...read more
  2. Full from of TMT, Ans- Thermo Mechanically Trea...read more
  3. Size of course aggregate ? Ans- 10mm and 20...read more

Tell us how to improve this page.

Singh Construction Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Singh Construction Reviews and Ratings

based on 15 reviews

3.3/5

Rating in categories

3.4

Skill development

3.0

Work-life balance

2.8

Salary

3.0

Job security

2.8

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 15 Reviews and Ratings
Civil Site Engineer
5 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Project Manager
4 salaries
unlock blur

₹8 L/yr - ₹12.1 L/yr

Site Engineer
4 salaries
unlock blur

₹2 L/yr - ₹2.2 L/yr

Civil Engineer
3 salaries
unlock blur

₹0.8 L/yr - ₹1.2 L/yr

Planning & Billing Engineer
3 salaries
unlock blur

₹2.5 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Singh Construction with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

Military Engineer Services

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview