i
Sila Solutions
Filter interviews by
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.
BMS system stands for Building Management System. It is a computer-based control system that monitors and manages various building functions.
BMS system is used to control and monitor HVAC (Heating, Ventilation, and Air Conditioning) systems in buildings.
It can also manage lighting, security, fire alarms, and other building systems.
BMS systems use sensors, controllers, and software to collect data and make adjustments t...
A BMS system is a centralized control system that monitors and manages various building systems.
BMS stands for Building Management System.
It integrates and controls various systems like HVAC, lighting, security, and fire safety.
It collects data from sensors and devices to monitor and optimize building performance.
BMS systems can automate processes, schedule maintenance, and provide real-time alerts.
Examples of BMS syst...
LMS stands for Load Management System in BMS which helps in managing the power consumption of the building.
LMS is a software-based system that monitors and controls the power consumption of a building.
It helps in optimizing the energy usage and reducing the energy costs.
LMS can be integrated with other systems in BMS such as HVAC, lighting, and security systems.
It can also provide real-time data on energy consumption a...
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
What is the responsibility you have to do and how to handle crucial situation.
posted on 21 Apr 2023
I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
Yes, I am familiar with monitoring the normal temperature alarm input channel system.
I have experience in monitoring the temperature alarm input channel system in a BMS setup.
I am aware of the normal temperature range and the alarm thresholds that need to be set.
I can troubleshoot any issues related to the temperature monitoring system.
I can take corrective actions in case of any temperature alarms.
For example, in my p...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
Specific power consumption is the amount of power consumed per unit of output.
It is a measure of energy efficiency.
It is calculated by dividing the power consumed by the output produced.
It is commonly used in industries to optimize energy usage.
Examples include kWh/ton in cement production and kWh/kg in textile manufacturing.
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Group discussion
Coding test
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
Power factor is the ratio of real power to apparent power in an AC circuit.
It is a measure of how efficiently electrical power is being used.
It ranges from 0 to 1, with 1 being the most efficient.
A low power factor can result in higher energy costs and equipment damage.
Capacitors can be used to improve power factor.
Example: A motor with a power factor of 0.8 requires 1.25 times more current than a motor with a power fa
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
posted on 7 May 2022
I applied via Referral and was interviewed in Apr 2022. There were 3 interview rounds.
Transformer safety measures include proper grounding, regular maintenance, and protective devices.
Proper grounding to prevent electrical shock
Regular maintenance to prevent overheating and other issues
Protective devices such as fuses and circuit breakers to prevent overloading
Use of personal protective equipment (PPE) when working with transformers
Proper storage and handling of transformers to prevent damage
To calculate KWH to Amps, divide KWH by hours and then divide by voltage.
Divide KWH by hours to get KW
Divide KW by voltage to get Amps
Formula: Amps = KWH / (hours * voltage)
Example: 100 KWH used in 10 hours with 120V = 0.83 Amps
based on 1 review
Rating in categories
Facility Manager
29
salaries
| ₹3.5 L/yr - ₹13 L/yr |
Shift Engineer
22
salaries
| ₹2 L/yr - ₹7 L/yr |
Property Manager
21
salaries
| ₹4.2 L/yr - ₹10.5 L/yr |
Assistant Manager
20
salaries
| ₹4.5 L/yr - ₹7.9 L/yr |
Assistant Facility Manager
18
salaries
| ₹3.6 L/yr - ₹6.6 L/yr |
Sodexo
ISS Facility Services
Compass Group Support Services
BVG India