Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
Questions based on SQL and java
The public static void main is the entry point of a Java program.
public: Access modifier indicating that the method is accessible from outside the class.
static: Indicates that the method belongs to the class itself, not to instances of the class.
void: Indicates that the method does not return any value.
main: The name of the method that serves as the entry point for the program.
String[] args: An array of strings that ca...
Truncate removes all records from a table, while delete removes specific records. Drop deletes the table itself.
Truncate is faster than delete as it does not log individual row deletions.
Delete can be rolled back, while truncate cannot be rolled back.
Drop removes the table structure along with all its data.
Example: TRUNCATE TABLE table_name;
Example: DELETE FROM table_name WHERE condition;
Example: DROP TABLE table_name;
The 4 pillars of Java are encapsulation, inheritance, polymorphism, and abstraction.
Encapsulation: Bundling data and methods that operate on the data into a single unit.
Inheritance: Allows a class to inherit properties and behavior from another class.
Polymorphism: Ability of an object to take on many forms.
Abstraction: Hiding the implementation details and showing only the necessary features of an object.
Top trending discussions
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 18 Jan 2025
I applied via Naukri.com and was interviewed in Jul 2024. There were 3 interview rounds.
The candidate should have a strong understanding of manufacturing and planning processes.
Knowledge of lean manufacturing principles
Experience with production scheduling and capacity planning
Understanding of supply chain management
Ability to optimize processes for efficiency and cost-effectiveness
I plan to continue advancing my skills in engineering through further education and certifications, as well as taking on more leadership roles within the field.
Pursuing a master's degree in engineering to deepen my knowledge and expertise
Obtaining professional certifications such as PMP or Six Sigma to enhance my skill set
Seeking opportunities to lead projects and teams to develop my leadership abilities
Staying updated...
Ensuring retention by creating a supportive work environment for employees and their families.
Offering flexible work hours and remote work options to accommodate family needs
Providing comprehensive health insurance and wellness programs for employees and their families
Organizing family-friendly events and activities to promote work-life balance
Offering competitive salaries and benefits to attract and retain top talent
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
posted on 2 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
I appeared for an interview before Jun 2021.
DCA and PLC are commonly used acronyms in the field of engineering.
DCA stands for Direct Current Amplifier, which is a device used to amplify direct current signals.
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
DCA and PLC are essential components in various engineering applications such as industrial automation and control systems.
based on 1 interview
Interview experience
Assistant Engineer
259
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
Diploma Trainee Engineer
200
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Senior Engineer
89
salaries
| ₹4.5 L/yr - ₹9.6 L/yr |
Quality Inspector
62
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Quality Engineer
53
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
ABB
Cummins
Thermax Limited
Isgec Heavy Engineering