The table index problem in special purpose machines refers to issues with the positioning of the table during operation.
Check for any mechanical issues with the table indexing mechanism
Inspect the sensors and actuators responsible for table movement
Verify the programming logic for table indexing in the machine's control system
Ensure proper calibration of the table positioning system
Consider potential wear and tear of c
Table index motor voltage varies depending on the specific motor and application.
Table index motor voltage can range from 110V to 480V depending on the motor size and power requirements
It is important to consult the motor's specifications or manual to determine the correct operating voltage
Using the wrong voltage can damage the motor and lead to malfunction
Some common voltages for table index motors include 220V and 38
The tapping head problem in an Spm machine may be caused by issues with the spindle, motor, or control system.
Check the spindle for any wear or damage that may be affecting the tapping operation.
Inspect the motor to ensure it is functioning properly and providing enough power for tapping.
Verify the control system settings to make sure they are correctly configured for tapping operations.
Top trending discussions
posted on 25 Apr 2024
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Synchronisation of generator involves aligning the speed and phase of the generator with the grid before connecting them. Motor protection and maintenance are crucial for ensuring the longevity and efficiency of the motor.
Synchronisation of generator involves matching the frequency, voltage, and phase angle of the generator with the grid before connecting them.
Motor protection includes measures such as overload protect...
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
posted on 2 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
based on 3 interviews
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
258
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
Diploma Trainee Engineer
201
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Senior Engineer
89
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Quality Inspector
62
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Quality Engineer
54
salaries
| ₹1 L/yr - ₹4.5 L/yr |
ABB
Cummins
Thermax Limited
Isgec Heavy Engineering