Filter interviews by
Overall future plan and sharing of knowledge
I applied via Campus Placement and was interviewed in Feb 2024. There were 2 interview rounds.
General Science Syllabus
I applied via Campus Placement and was interviewed before Aug 2023. There was 1 interview round.
A vernier caliper typically has a list count of 10 divisions on the main scale and 9 divisions on the vernier scale.
Vernier calipers commonly have 10 divisions on the main scale and 9 divisions on the vernier scale.
The main scale represents millimeters while the vernier scale allows for more precise measurements in fractions of a millimeter.
The vernier scale helps to determine the measurement by aligning the lines on t...
I applied via Approached by Company and was interviewed in Apr 2023. There were 3 interview rounds.
Discussion on my Working Experience and The new comp. Future.
Sigma Electric Manufacturing Corporation interview questions for popular designations
I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Aptitude was like time and destination questions
I applied via Naukri.com and was interviewed in Sep 2022. There were 4 interview rounds.
Topic Related to HR Case Study and Solutions
I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Nov 2019. There was 1 interview round.
Top trending discussions
The duration of Sigma Electric Manufacturing Corporation interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 8 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Diploma Trainee Engineer
404
salaries
| ₹1.1 L/yr - ₹2.8 L/yr |
Assistant Engineer
342
salaries
| ₹1.6 L/yr - ₹5 L/yr |
Quality Engineer
100
salaries
| ₹1.5 L/yr - ₹4.4 L/yr |
Production Engineer
88
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Senior Engineer
84
salaries
| ₹3.6 L/yr - ₹8.9 L/yr |
John Deere
Caterpillar Inc
TÜV SÜD
TKIL