Upload Button Icon Add office photos

Filter interviews by

Shri Bajrang Power & Ispat DCS Engineer Interview Questions and Answers

Updated 30 Mar 2023

Shri Bajrang Power & Ispat DCS Engineer Interview Experiences

2 interviews found

DCS Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Mar 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Viva 

(2 Questions)

  • Q1. About power plant and operational related
  • Q2. Technically basics science question

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your knowlede in your field technically strong from basic

DCS Engineer Interview Questions & Answers

user image Anonymous

posted on 4 Jan 2023

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Working experience year total
  • Q2. What is current salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge about boiler and turbine operation and maintenance

DCS Engineer Interview Questions Asked at Other Companies

Q1. why Ssc is increased when load is reduced As a dcs engineer what ... read more
Q2. Which DCS you have handled and it's iOS capacity
Q3. what is controlled and uncontrolled extraction?
Q4. What is the heat rate of the plant?
Q5. what is bolier. what is mounting and Acciseries of boiler. Boiler ... read more

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. AFBC Start-up procedures
  • Ans. 

    AFBC start-up procedures involve several steps to ensure safe and efficient operation.

    • Inspect fuel and air supply systems

    • Check boiler water level and pressure

    • Purge furnace and flue gas passages

    • Start ID and FD fans

    • Ignite fuel and adjust air flow

    • Monitor temperature and pressure

    • Gradually increase load

  • Answered by AI
  • Q2. What are Emergencies do you faced?
  • Ans. 

    I have faced emergencies related to power outages and system failures.

    • Power outage: I have experienced situations where there was a sudden loss of power, leading to system shutdowns and the need to quickly restore power to prevent data loss or equipment damage.

    • System failure: I have encountered instances where critical systems or components failed, causing disruptions in operations. These emergencies required troublesh...

  • Answered by AI
  • Q3. Water chemistry
  • Q4. ESP isolation procedures

I was interviewed before Jan 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 3 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 4 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 5 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Any questions hr team
  • Ans. My contact no not any time network area ple msg me
  • Answered Anonymously
Round 6 - Case Study 

Diploma

Round 7 - HR 

(1 Question)

  • Q1. What are your salary expectations?
Round 8 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 9 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 10 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 11 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil engginer my experience hydro, irrigation tunnel, rvnl tunnel

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. All about area related work
Round 3 - HR 

(1 Question)

  • Q1. Package finalizing and house allotment process

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to go for freshers, its most trusted brand in steel making, but work hours may vary depending on your area of working
Interview experience
3
Average
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Working principle of ngr
  • Ans. 

    NGR (Next Generation Routing) is a networking technology that dynamically routes traffic based on real-time network conditions.

    • NGR uses machine learning algorithms to analyze network data and make routing decisions.

    • It can optimize traffic flow by selecting the best path based on factors like latency, bandwidth, and congestion.

    • NGR can adapt to changing network conditions in real-time, improving performance and reliabili...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Working principle of Ngr
  • Ans. 

    Ngr stands for Next Generation Routing. It is a routing protocol used in networking to determine the best path for data packets to travel.

    • Ngr uses advanced algorithms to calculate the most efficient route for data packets.

    • It takes into account factors such as network congestion, latency, and available bandwidth.

    • Ngr helps in optimizing network performance and reducing packet loss.

    • Examples of Ngr protocols include OSPF (...

  • Answered by AI

I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Operations, maintenance, project related questions asks
  • Q2. Plant production related products and services quality related questions ask.

Interview Preparation Tips

Interview preparation tips for other job seekers - Plant post of Asst.manager mechanical maintenance work and operations, project management and team management services work related asked.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic aptitude test with time limit

Round 3 - One-on-one 

(2 Questions)

  • Q1. Basically questions about the trade about you are working or knowledge of job and experience , the job in the field of interest is very important
  • Q2. Ask about educational qualification and any achievements

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay focused and keep your goals clear to get the final round

I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Basic questions about production
Round 3 - Technical 

(1 Question)

  • Q1. Interview by production AGM
Round 4 - HR 

(1 Question)

  • Q1. HR related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - If they require then they will hire you with basic knowledge of your field

Shri Bajrang Power & Ispat Interview FAQs

How many rounds are there in Shri Bajrang Power & Ispat DCS Engineer interview?
Shri Bajrang Power & Ispat interview process usually has 2 rounds. The most common rounds in the Shri Bajrang Power & Ispat interview process are Resume Shortlist and HR.
How to prepare for Shri Bajrang Power & Ispat DCS Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shri Bajrang Power & Ispat. The most common topics and skills that interviewers at Shri Bajrang Power & Ispat expect are DCS and DCS Operation.
What are the top questions asked in Shri Bajrang Power & Ispat DCS Engineer interview?

Some of the top questions asked at the Shri Bajrang Power & Ispat DCS Engineer interview -

  1. About power plant and operational rela...read more
  2. Technically basics science quest...read more

Tell us how to improve this page.

Shri Bajrang Power & Ispat DCS Engineer Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 822 Interviews
JSW Steel Interview Questions
3.9
 • 595 Interviews
Adani Power Interview Questions
3.9
 • 218 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 119 Interviews
View all
Shri Bajrang Power & Ispat DCS Engineer Salary
based on 4 salaries
₹2.1 L/yr - ₹4 L/yr
39% less than the average DCS Engineer Salary in India
View more details

Shri Bajrang Power & Ispat DCS Engineer Reviews and Ratings

based on 2 reviews

2.5/5

Rating in categories

2.5

Skill development

2.5

Work-life balance

2.0

Salary

2.5

Job security

2.5

Company culture

2.0

Promotions

2.5

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
56 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
53 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
39 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Shri Bajrang Power & Ispat with

JSW Steel

3.9
Compare

Tata Steel

4.1
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview