Filter interviews by
There are several types of electrical hazards on a construction site.
Electrocution from contact with live wires
Electrical burns from faulty equipment
Fires caused by electrical malfunctions
Explosions due to improper handling of electrical equipment
Electric shock from faulty grounding or insulation
posted on 16 Oct 2024
My name is John Smith, a seasoned engineer with over 10 years of experience in the field.
Full name: John Smith
Years of experience: 10+
Engineering background
I have completed 10 projects in my career as a senior engineer.
Completed 10 projects in various industries such as automotive, aerospace, and telecommunications.
Led a team of engineers to successfully complete a project for a major automotive company.
Implemented new technologies in projects to improve efficiency and performance.
Collaborated with cross-functional teams to deliver projects on time and within budget.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
PCC and RCC are different types of concrete used in construction.
PCC stands for Plain Cement Concrete and is used for non-structural components like flooring, leveling, etc.
RCC stands for Reinforced Cement Concrete and is used for structural components like beams, columns, slabs, etc.
PCC does not contain any reinforcement while RCC has steel reinforcement to enhance its strength and durability.
PCC has a lower strength ...
The steel is placed in the SSB and cantilever beam to provide reinforcement and increase structural strength.
Steel reinforcement is typically placed in the tension zone of the SSB and cantilever beam.
The steel bars are positioned parallel to the axis of the beam to resist tensile forces.
The placement of steel bars should follow the design specifications and structural engineering principles.
In SSB, steel bars are commo...
Creep, hogging, and sagging are terms used in engineering to describe different types of structural deformations.
Creep refers to the gradual deformation of a material under a constant load over time.
Hogging is a term used to describe the downward curvature of a beam or structure in the middle, caused by excessive load on the ends.
Sagging is the opposite of hogging, where the beam or structure curves upward in the middl...
Prestressed concrete is better than normal RCC due to its higher strength, durability, and reduced cracking.
Prestressed concrete has higher strength and load-carrying capacity compared to normal reinforced concrete.
It offers improved durability and resistance to environmental factors such as corrosion.
Prestressed concrete reduces cracking and deflection under load, enhancing structural integrity.
It allows for longer sp...
The parent's background refers to their education, occupation, and cultural heritage.
Education: Mention the highest level of education attained by the parents.
Occupation: Describe the type of work the parents are engaged in.
Cultural Heritage: Highlight the cultural background or ethnicity of the parents.
Example: The father has a master's degree in engineering and works as a software engineer, while the mother has a bac...
Yes, I am willing to work anywhere in India.
I am open to opportunities in any location within India.
I am flexible and adaptable to different work environments.
I believe that working in different parts of India will provide me with diverse experiences and help me grow professionally.
I am willing to relocate if required for the job.
Yes, I know Hindi and can speak fluently.
I am fluent in speaking Hindi.
I have a good understanding of the language.
I can communicate effectively in Hindi.
I have experience conversing in Hindi in various situations.
I can read and write in Hindi as well.
Drawing BMD and SFD of propped cantilever
Identify the support and the point of loading
Calculate the reactions at the support
Draw the SFD by starting from one end and moving towards the other
Draw the BMD by starting from the other end and moving towards the first
Label the maximum and minimum values of SFD and BMD
Check for equilibrium and consistency
The point where the shear force is zero is called the point of contraflexure.
Point of contraflexure is the point where bending moment changes sign.
It is the point where the bending moment is maximum.
It occurs in a beam when the shear force changes sign.
It is important to determine the point of contraflexure in order to design a beam that can withstand the loads applied to it.
M20 and Fe415 are grades of concrete and steel used in construction.
M20 is a mix of concrete with a compressive strength of 20 N/mm² after 28 days of curing.
Fe415 is a grade of steel with a yield strength of 415 N/mm².
M20 is commonly used for residential construction while Fe415 is used for reinforcement in concrete structures.
Both M20 and Fe415 are standardized by the Bureau of Indian Standards (BIS).
The volume of a cube is calculated by multiplying the length of its sides.
Volume = side x side x side
All sides of a cube are equal
Formula: V = s^3
I am a highly motivated individual with a passion for learning and a strong work ethic.
I have a Bachelor's degree in Computer Science
I have experience working as a software developer for 3 years
I am proficient in Java, Python, and SQL
I am a quick learner and enjoy taking on new challenges
I am impressed with the company's reputation and growth potential.
I have researched the company and its achievements.
I am excited about the opportunity to work with a talented team.
I believe my skills and experience align well with the company's goals.
I am looking for a challenging and rewarding career, and I believe this company can provide that.
I am impressed with the company's commitment to innovation and customer s
based on 14 reviews
Rating in categories
Junior Engineer Civil
5
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Purchase Executive
4
salaries
| ₹3.6 L/yr - ₹5.6 L/yr |
Quality Engineer
4
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Project Manager Civil
4
salaries
| ₹8 L/yr - ₹12 L/yr |
Civil Engineer
4
salaries
| ₹3.5 L/yr - ₹3.8 L/yr |
GAMMON INDIA
Karam Industries
Ray Engineering
MaRS Planning & Engineering Services