Upload Button Icon Add office photos

Filter interviews by

Shivalik Projects Interview Questions and Answers

Updated 4 Nov 2021

Shivalik Projects Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. Construction site Hazards electrical Hazards how many types of Hazards
  • Ans. 

    There are several types of electrical hazards on a construction site.

    • Electrocution from contact with live wires

    • Electrical burns from faulty equipment

    • Fires caused by electrical malfunctions

    • Explosions due to improper handling of electrical equipment

    • Electric shock from faulty grounding or insulation

  • Answered by AI
  • Q2. Documents about hira jsa site plan hse plan all Documents related safety acoording iso

Safety Incharge Interview Questions asked at other Companies

Q1. Construction site Hazards electrical Hazards how many types of Hazards
View answer (2)

Jobs at Shivalik Projects

View all

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job

Detailer,modeller, Checker Interview Questions & Answers

Cadeploy Engineering user image Anonymous

posted on 10 Feb 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. No questions from hr
Round 2 - Technical 

(2 Questions)

  • Q1. Tool test given
  • Q2. For our role related...input or task given
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical questions asked

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare AISC standards and familiarize yourself with Tekla tools.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. Introduction and Salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Technical skills, relevant code and standard practice

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have don't job then only go for this company. Job security is zero.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Assignment 

Purchase Assignment - Comparing PO's

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the Basic Rule of Purchase
  • Q2. How mant quotations will you take before evaluating
Round 3 - HR 

(2 Questions)

  • Q1. Expectations From the company?
  • Q2. Expected Compensiation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company, You will get experience Letter.

Shivalik Projects Interview FAQs

How to prepare for Shivalik Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shivalik Projects. The most common topics and skills that interviewers at Shivalik Projects expect are Angularjs, Digital Marketing, MongoDB, MySQL and Postgresql.
What are the top questions asked in Shivalik Projects interview?

Some of the top questions asked at the Shivalik Projects interview -

  1. Construction site Hazards electrical Hazards how many types of Hazar...read more
  2. Documents about hira jsa site plan hse plan all Documents related safety acoord...read more

Tell us how to improve this page.

Shivalik Projects Reviews and Ratings

based on 14 reviews

3.8/5

Rating in categories

3.4

Skill development

3.7

Work-life balance

3.5

Salary

3.6

Job security

2.7

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 14 Reviews and Ratings
Full Stack Angular Developer

Mohali,

Chandigarh

+1

5-10 Yrs

Not Disclosed

Explore more jobs
Junior Engineer Civil
5 salaries
unlock blur

₹2.4 L/yr - ₹5.2 L/yr

Purchase Executive
4 salaries
unlock blur

₹3.6 L/yr - ₹5.6 L/yr

Quality Engineer
4 salaries
unlock blur

₹1.5 L/yr - ₹2 L/yr

Project Manager Civil
4 salaries
unlock blur

₹8 L/yr - ₹12 L/yr

Civil Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Shivalik Projects with

GAMMON INDIA

3.8
Compare

Karam Industries

4.0
Compare

MaRS Planning & Engineering Services

3.8
Compare

Ray Engineering

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview