I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
Construction refers to the process of building or assembling infrastructure, typically involving the use of materials and labor.
Construction involves the creation of buildings, roads, bridges, and other structures.
It requires planning, design, and execution to ensure the project is completed successfully.
Materials such as concrete, steel, wood, and glass are commonly used in construction.
Laborers, engineers, architects...
A relay is an electrically operated switch that controls a high-power circuit with a low-power signal.
Relays are used to control circuits by opening or closing contacts in response to a signal
There are several types of relays including electromechanical relays, solid-state relays, thermal relays, and reed relays
Examples of relays include automotive relays used in cars to control lights and motors, and industrial relays
Current is the flow of electric charge, while voltage is the force that drives the current.
Current is measured in Amperes (A), while voltage is measured in Volts (V).
Current is the rate of flow of electric charge, while voltage is the potential difference that drives the current.
In a circuit, current is the flow of electrons from negative to positive terminal, while voltage is the difference in electric potential betwe...
The formula for acceleration is the change in velocity divided by the time taken for the change to occur.
Acceleration = (Final velocity - Initial velocity) / Time taken
Acceleration is a vector quantity, meaning it has both magnitude and direction
Units of acceleration are typically meters per second squared (m/s^2)
Examples: A car accelerating from 0 to 60 mph in 10 seconds has an acceleration of 6 mph/s or 2.68 m/s^2
What is the rule to change any point machine ?
Top trending discussions
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
25 Civil Engineering related Questions
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Site Engineer
12
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Project Manager
5
salaries
| ₹6.6 L/yr - ₹10.8 L/yr |
Senior Accounts and Finance Assistant
4
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Senior Surveyor
4
salaries
| ₹3.4 L/yr - ₹4.8 L/yr |
Assistant Manager Procurement
4
salaries
| ₹3.6 L/yr - ₹4.8 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim