Add office photos
Employer?
Claim Account for FREE

Shalimar Corp

4.1
based on 169 Reviews
Filter interviews by

Housing.com Interview Questions and Answers

Updated 5 Jan 2025

Q1. How you can do Earthwork Sub-Contractor Billing. If subcon are 7 to 8 and working in the same location as per instruction of Site Engineer Incharge.

Ans.

Earthwork sub-contractor billing for multiple subcontractors working in the same location.

  • Create separate billing accounts for each sub-contractor to track expenses accurately.

  • Document the work completed by each sub-contractor to ensure accurate billing.

  • Coordinate with the Site Engineer Incharge to verify the work done by each sub-contractor.

  • Use a standardized billing format to avoid confusion and disputes.

  • Regularly review and reconcile billing with the actual work done by ea...read more

Add your answer

Q2. What are the process of Material Reconciliation Statement and how you can prepare Do it ?

Ans.

Material Reconciliation Statement is a process of comparing the physical stock of materials with the book stock to identify discrepancies.

  • Collect physical stock count of materials

  • Compare physical stock count with book stock count

  • Identify discrepancies and investigate reasons

  • Adjust book stock based on physical count

  • Prepare Material Reconciliation Statement to document findings

Add your answer

Q3. Tell me the different Types of Piles used in bridge construction.

Ans.

Different types of piles used in bridge construction include driven piles, drilled piles, and helical piles.

  • Driven piles are installed by driving them into the ground using a pile driver.

  • Drilled piles are created by drilling a hole into the ground and then filling it with concrete and reinforcing steel.

  • Helical piles are screwed into the ground using a hydraulic motor and are often used in areas with difficult soil conditions.

  • Other types of piles include timber piles, steel pi...read more

Add your answer

Q4. Work Experience in Highways sector, Billing Experience, Reconciliation ?

Ans.

I have 5 years of work experience in the Highways sector with a focus on billing and reconciliation.

  • Managed billing processes for highway construction projects

  • Performed regular reconciliations of invoices and payments

  • Worked closely with project managers to ensure accurate billing

  • Utilized software systems to track billing and financial data

  • Resolved billing discrepancies and issues in a timely manner

Add your answer
Discover Housing.com interview dos and don'ts from real experiences

Q5. What you Know about HAM Project ?

Ans.

HAM Project is a research project focusing on understanding the human brain through the analysis of brain tissue samples.

  • HAM stands for Human Brain Mapping

  • It involves studying brain tissue samples to map out the structure and function of the human brain

  • The project aims to advance our understanding of brain disorders and diseases

  • Researchers use various imaging techniques and data analysis methods to study the brain

Add your answer

Q6. Tell me about how to build a superstructure in a black cotton soil.

Ans.

Building a superstructure in black cotton soil requires proper soil stabilization techniques.

  • The soil needs to be stabilized using lime, cement, or other stabilizers.

  • Proper drainage systems need to be installed to prevent water accumulation.

  • The foundation needs to be designed to distribute the load evenly.

  • Pile foundation can be used to provide additional support.

  • Regular soil testing and monitoring is necessary to ensure stability.

  • Examples of successful superstructure construc...read more

Add your answer

Q7. segregation and types of compressive strenght test

Ans.

Segregation is the separation of concrete ingredients, compressive strength tests include cube test, cylinder test, and core test.

  • Segregation in concrete can occur due to improper mixing or handling during placement.

  • Cube test is commonly used to determine the compressive strength of concrete samples.

  • Cylinder test is another method to test the compressive strength of concrete.

  • Core test involves drilling a core sample from the structure to test its compressive strength.

  • Segregat...read more

Add your answer

Q8. Concrete specifications and mixing procedures

Ans.

Concrete specifications and mixing procedures

  • Concrete specifications include strength, slump, air content, and maximum aggregate size

  • Mixing procedures involve proper proportioning of materials, thorough mixing, and appropriate curing

  • Concrete should be mixed for at least 2 minutes and not more than 5 minutes

  • Water-cement ratio should be maintained as per the specifications

  • Admixtures can be added to improve the properties of concrete

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Housing.com

based on 16 interviews
Interview experience
3.9
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.1
 • 571 Interview Questions
3.9
 • 215 Interview Questions
3.8
 • 153 Interview Questions
4.1
 • 148 Interview Questions
4.2
 • 142 Interview Questions
3.8
 • 135 Interview Questions
View all
Top Shalimar Corp Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter