Upload Button Icon Add office photos

Filter interviews by

Sendan International Co Electrical & Instrumentation Engineer Interview Questions and Answers

Updated 29 Jul 2024

Sendan International Co Electrical & Instrumentation Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. What are current job duties?
  • Ans. 

    Design, develop, test, and maintain electrical and instrumentation systems in various industries.

    • Designing electrical systems for industrial processes

    • Developing control systems for automation

    • Testing and troubleshooting instrumentation equipment

    • Maintaining electrical and instrumentation systems

    • Collaborating with other engineers and technicians

    • Ensuring compliance with safety regulations

    • Providing technical support to oper

  • Answered by AI
Round 2 - Coding Test 

What is SWA Cable and what is AWG?

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Cable tray standards
  • Q2. Calibration procedure
  • Ans. 

    Calibration procedure involves comparing the measurement device with a known standard to ensure accuracy.

    • Select a known standard with a higher accuracy than the device being calibrated

    • Perform measurements on the standard and record the readings

    • Compare the readings with the device being calibrated

    • Adjust the device if necessary to match the standard

    • Repeat the process until the readings match within an acceptable range

  • Answered by AI
  • Q3. Hazardous zone classifications and protection Techniques
  • Ans. 

    Hazardous zones are classified based on the likelihood of explosive gas or dust. Protection techniques include explosion-proof equipment and ventilation.

    • Hazardous zones are classified into Zone 0, Zone 1, and Zone 2 based on the likelihood of explosive gas or dust.

    • Zone 0 is where explosive gas or dust is present continuously or for long periods of time.

    • Zone 1 is where explosive gas or dust is likely to occur during nor...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Electrical & Instrumentation Engineer interview:
  • SIS
  • SIL
  • Atex
  • Dcs configuration
Interview preparation tips for other job seekers - Determine that which job profile you have more interest accordingly develop the skills.

You will get it

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

1 Question

  • Q1. Business Ideas

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare properly for Interviews

I appeared for an interview in Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. They asked me about RAM and ROM

Interview Preparation Tips

Round: Technical Interview
Experience: I studied about them before so it was not a problem for me

Skills: Coding Skills
College Name: IIT Kharagpur

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect

Sendan International Co Interview FAQs

How many rounds are there in Sendan International Co Electrical & Instrumentation Engineer interview?
Sendan International Co interview process usually has 2 rounds. The most common rounds in the Sendan International Co interview process are HR and Coding Test.

Tell us how to improve this page.

Sendan International Co Electrical & Instrumentation Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 52 Interviews
View all
Planning Engineer
11 salaries
unlock blur

₹6.2 L/yr - ₹20.6 L/yr

Project Engineer Mechanical
7 salaries
unlock blur

₹3.9 L/yr - ₹12.4 L/yr

Construction Management
7 salaries
unlock blur

₹24 L/yr - ₹36.2 L/yr

Project Engineer
6 salaries
unlock blur

₹12 L/yr - ₹12.6 L/yr

Senior Store Keeper
6 salaries
unlock blur

₹4.1 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Sendan International Co with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview