i
Schaeffler India
Filter interviews by
I applied via Approached by Company and was interviewed before Mar 2021.Ā There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2021.Ā There were 2 interview rounds.
Top trending discussions
posted on 6 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021.Ā There was 1 interview round.
My competencies include technical knowledge, problem-solving skills, attention to detail, and teamwork.
Strong technical knowledge in electrical engineering principles and practices
Ability to solve complex problems and troubleshoot electrical systems
Attention to detail in design, testing, and documentation
Collaborative teamwork skills to work effectively with colleagues and clients
Proficiency in using electrical design ...
As a technical support, I provide prompt and efficient solutions to customer's electrical problems.
Listen to the customer's problem and ask relevant questions to understand the issue
Provide step-by-step instructions to troubleshoot the problem
Offer remote assistance or schedule an on-site visit if necessary
Ensure customer satisfaction by following up after the issue has been resolved
I applied via Naukri.com and was interviewed in Dec 2020.Ā There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2020.Ā There were 3 interview rounds.
I have successfully implemented preventive maintenance programs, reducing equipment downtime by 20%.
Implemented preventive maintenance programs
Reduced equipment downtime by 20%
Improved overall equipment reliability
Streamlined maintenance processes
Trained and mentored junior maintenance staff
posted on 15 Dec 2019
I applied via Naukri.com and was interviewed in Nov 2019.Ā There were 5 interview rounds.
The question is asking about knowledge and understanding of various algorithms including loops and search.
Loops: for, while, do-while
Search: linear search, binary search
Sorting: bubble sort, insertion sort, selection sort, merge sort, quick sort
Graph algorithms: breadth-first search, depth-first search
Dynamic programming: Fibonacci series, knapsack problem
Examples: finding the largest number in an array using a loop, s...
I applied via Naukri.com and was interviewed in Feb 2021.Ā There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jul 2022.Ā There were 3 interview rounds.
A CNC machine can have 3, 4, or 5 axes depending on its configuration.
The X, Y, and Z axes are common in 3-axis machines.
4-axis machines add a rotary axis, usually the A-axis.
5-axis machines add a second rotary axis, usually the B-axis.
Some machines may have additional axes for specialized operations, such as milling machines with a tilting spindle head.
The number of axes determines the machine's capabilities and the c
Maintenance procedure involves regular inspection, cleaning, repair and replacement of equipment to ensure optimal performance and prevent breakdowns.
Create a maintenance schedule based on manufacturer recommendations and equipment usage
Perform regular inspections to identify potential issues before they become major problems
Clean and lubricate equipment as needed to prevent wear and tear
Repair or replace damaged or wo...
The question is incomplete or incorrect. There is no such term as 'back las'.
There is no known term or phrase as 'back las'.
It is possible that the interviewer made a mistake or was trying to ask a different question.
As a maintenance engineer, it is important to clarify any unclear or confusing questions to ensure accurate responses.
Types of maintenance include corrective, preventive, predictive, and proactive maintenance.
Corrective maintenance involves fixing a problem after it has occurred.
Preventive maintenance involves regularly scheduled maintenance to prevent problems from occurring.
Predictive maintenance involves using data and analytics to predict when maintenance is needed.
Proactive maintenance involves identifying and addressing potentia...
The number of points in a PM checklist varies depending on the equipment being checked.
PM checklists are specific to each piece of equipment.
The number of points in a PM checklist can range from a few to hundreds.
Points in a PM checklist can include tasks such as inspecting, cleaning, and lubricating equipment.
The purpose of a PM checklist is to ensure that equipment is properly maintained and to prevent breakdowns.
The...
Machines need regular preventive maintenance (PM) to ensure optimal performance and longevity.
Regular cleaning and lubrication
Inspection and replacement of worn parts
Calibration and adjustment of sensors and controls
Testing and monitoring of performance
Documentation of maintenance activities
Training of operators and maintenance staff
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed system or equipment.
MTBF is the average time between two consecutive failures of a system or equipment.
MTTR is used to measure the efficiency of maintenance and repair processes.
MTBF is used to measure the reliability of a system or equipment.
MTBF = (total operating time - total downtime)...
MTTR is the average time to repair a failed system while MTBF is the average time between failures.
MTTR measures the maintainability of a system while MTBF measures its reliability.
MTTR is calculated by dividing the total downtime by the number of failures while MTBF is calculated by dividing the total uptime by the number of failures.
MTTR is usually shorter than MTBF as it only measures the time to repair a failed sys...
Breakdown is an unexpected failure of equipment or machinery. KPI stands for Key Performance Indicator, a measurable value that indicates how well a company is achieving its goals.
Breakdown can cause production delays and loss of revenue
KPIs can be used to track maintenance performance and identify areas for improvement
Examples of KPIs for maintenance include equipment uptime, mean time between failures, and maintenanc
I applied via Approached by Company and was interviewed in May 2022.Ā There were 4 interview rounds.
based on 2 reviews
Rating in categories
Senior Executive
187
salaries
| ā¹5.1 L/yr - ā¹11.1 L/yr |
Deputy Manager
152
salaries
| ā¹8 L/yr - ā¹16 L/yr |
Executive
147
salaries
| ā¹2 L/yr - ā¹10 L/yr |
Team Lead
116
salaries
| ā¹5 L/yr - ā¹16 L/yr |
Production Engineer
108
salaries
| ā¹1.4 L/yr - ā¹7.6 L/yr |
Bosch
Yazaki
Faurecia
Hitachi Astemo