Filter interviews by
I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
posted on 26 Jan 2024
Introducing, departments related advice, wastage, cost control, handling store and material
I applied via LinkedIn and was interviewed in May 2023. There were 2 interview rounds.
Yes, I have store requirements to ensure smooth operations and customer satisfaction.
Yes, I have specific requirements for store layout and organization.
I require a certain level of inventory management to meet customer demand.
I have standards for customer service and employee training.
I may have specific technology or equipment requirements for the store.
Examples: specific shelving units, POS system, security cameras.
Effective material management is crucial for controlling stock in and out, maintaining inventory, and ensuring smooth loading and unloading processes.
Implementing a robust inventory management system to track stock levels and monitor movement
Regularly conducting stock audits to identify discrepancies and prevent stockouts or overstocking
Establishing efficient loading and unloading procedures to minimize delays and opti...
posted on 16 Mar 2024
I applied via Company Website and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
About store procedures and systems
Planning in inventory management involves forecasting demand, setting inventory levels, and replenishing stock.
Forecasting demand based on historical sales data and market trends
Setting inventory levels to balance customer demand and cost of holding inventory
Replenishing stock in a timely manner to avoid stockouts and overstocking
Using inventory management software to track inventory levels and automate replenishment
Re...
I applied via Newspaper Ad and was interviewed before Jul 2021. There were 3 interview rounds.
To measure a full truck load of sand, calculate the volume in cubic feet (cft) by multiplying the length, width, and height of the truck bed.
Measure the length, width, and height of the truck bed
Multiply the three measurements to get the volume in cubic feet (cft)
For example, if the truck bed is 10 feet long, 5 feet wide, and 3 feet high, the volume would be 150 cubic feet (10 x 5 x 3)
Ensure the truck is loaded evenly
Pls tell me one of your achievements in your last employer ?
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Need to training for design software course.
I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.
The pile time cycle is the time taken to complete a single pile driving operation.
It involves the driving of a pile into the ground using a pile driver.
The cycle includes lifting the hammer, dropping it onto the pile, and raising it again.
Factors affecting the cycle include the size and weight of the hammer, soil conditions, and the length of the pile.
The cycle time can be reduced by using a hydraulic hammer or pre-aug...
I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
based on 1 interview
Interview experience
CCR Officer
8
salaries
| ₹4.8 L/yr - ₹7.5 L/yr |
Plant Head
4
salaries
| ₹60 L/yr - ₹80 L/yr |
Store Manager
3
salaries
| ₹8 L/yr - ₹9.8 L/yr |
Senior Manager Corporate HR
3
salaries
| ₹14.2 L/yr - ₹14.2 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures