I applied via Referral and was interviewed in Jun 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
posted on 13 Apr 2022
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
Journal knowledge of plastic raw material and their defect
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
Maintenance jobs are crucial for ensuring the smooth functioning of equipment and preventing breakdowns.
Maintenance jobs involve regular inspections, cleaning, and repairs of equipment.
They help to identify and fix issues before they become major problems.
Proper maintenance can extend the lifespan of equipment and reduce the need for costly replacements.
Examples of maintenance jobs include oil changes, filter replaceme...
I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 3 interview rounds.
GD&T symbols are used to specify geometric tolerances on engineering drawings.
GD&T stands for Geometric Dimensioning and Tolerancing
It is a system of symbols used to specify the allowable variation in form and size of features on a part
Examples of GD&T symbols include: flatness, perpendicularity, concentricity, and position
GD&T is important for ensuring parts are manufactured to the correct specifications and fit toget
True position on CMM can be checked using a combination of software and hardware tools.
Use a calibrated probe to measure the feature location
Compare the measured location with the nominal location
Calculate the deviation and compare it with the tolerance
Use software tools like GD&T to analyze the results
Ensure the CMM is calibrated and the probe is in good condition
FMEA stands for Failure Mode and Effects Analysis. It is a systematic approach to identify and prevent potential failures in a process or product.
FMEA is used to identify potential failures in a process or product and their effects on the system.
It involves analyzing the likelihood of failure, severity of the consequences, and the ability to detect the failure before it occurs.
FMEA is commonly used in industries such a...
Instrument selection involves identifying the appropriate tools and equipment for a specific task or process.
Identify the purpose of the instrument
Consider the accuracy and precision required
Evaluate the cost and availability
Ensure the instrument is compatible with other equipment
Consider the maintenance and calibration requirements
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
Quality tools are techniques used to improve quality and productivity. Kaizen, 5S, fishbone diagram, and poka yoke are some examples.
Kaizen is a continuous improvement process that involves everyone in the organization.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
Fishbone diagram is a tool used to identify the root cause of a problem by analyzing its ...
based on 3 interviews
Interview experience
based on 52 reviews
Rating in categories
Engineer
249
salaries
| ₹2 L/yr - ₹6.2 L/yr |
Senior Engineer
239
salaries
| ₹3.5 L/yr - ₹9.2 L/yr |
Quality Inspector
223
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Trainee
185
salaries
| ₹1 L/yr - ₹4 L/yr |
Junior Engineer
175
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres