Upload Button Icon Add office photos

Filter interviews by

Sanjeev Group Deputy Manager Interview Questions and Answers

Updated 5 Jun 2023

Sanjeev Group Deputy Manager Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Working in LPG bullet
Round 3 - One-on-one 

(1 Question)

  • Q1. Basic function in ETP
  • Ans. 

    ETP stands for Effluent Treatment Plant, which is used to treat industrial wastewater before it is released into the environment.

    • ETP removes contaminants from wastewater through physical, chemical, and biological processes.

    • Common processes in ETP include screening, sedimentation, coagulation, flocculation, and disinfection.

    • Example: In a textile industry, ETP is used to treat wastewater containing dyes and chemicals bef

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You can work here

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About my self and background
  • Q2. Cement and Industry related questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. About area and demography
  • Q2. About your roal and ur market

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about your area and demographic
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. HV Battery construction and Working
  • Ans. 

    HV Battery construction and working involves multiple cells connected in series and parallel to store and release electrical energy.

    • HV batteries are typically made up of multiple cells connected in series and parallel to achieve the desired voltage and capacity.

    • The cells are usually lithium-ion or nickel-metal hydride, with each cell containing an anode, cathode, and electrolyte.

    • The construction includes a casing to ho...

  • Answered by AI
  • Q2. How is the LV & HV System Works in Electrical Vehicles
  • Ans. 

    LV & HV systems in electric vehicles work together to power the vehicle efficiently and safely.

    • LV system (low voltage) powers auxiliary systems like lights, radio, and power windows.

    • HV system (high voltage) powers the main components like the motor and battery.

    • LV system typically operates at 12V, while HV system operates at 200-800V.

    • HV system requires special safety precautions due to high voltage levels.

    • Both systems w...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Package I am getting, and expectation
  • Q2. Salary discussion
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Interview Mein 8 se 10 prashn Puche Jaate Hain
  • Q2. Answer ya question ka answer Uttar dene per hi to selection Kiya jata hai
Round 2 - HR 

(1 Question)

  • Q1. Char Ka kam hai ki customer care se baat hone per Agar usse Kam Nahin hone per vichar ko call kiya jata hai
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Tell me about your self 2. Tell me about your day to day work and roles and responsibilities in current role 3. Projects taken to use RCA PCA and resolved issues 4. Project planning execution and how y...

Interview Preparation Tips

Topics to prepare for Quess Deputy Manager interview:
  • Diagnostics
  • Electricals
  • Production Planning
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

FOR FIRST ROUND OF INTERVIEW ITS TAKE 10 TO 15 MINUTES

Round 2 - One-on-one 

(1 Question)

  • Q1. WHY YOU CHOOSE THIS COMPANY
  • Ans. 

    I chose this company because of its strong reputation in the industry and commitment to employee growth and development.

    • Strong reputation in the industry

    • Commitment to employee growth and development

    • Positive company culture

    • Opportunities for advancement

    • Innovative projects and initiatives

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Mills and wagon tippler
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Case Study 

How to handle employee grievances

Deputy Manager Interview Questions & Answers

JK Cement user image ANAND KUMAR MISHRA

posted on 20 Feb 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Group discussion with HSL & ZHL

Round 2 - HR 

(1 Question)

  • Q1. Job change & saylry

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent Support

I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Future Goals
  • Q2. Different market exposure and experience, market strategy, sales planninfg forecasting and execution, pricing

Interview Preparation Tips

Interview preparation tips for other job seekers - People must be very well prepared, confident, having full knowledge of his/her profile. Must done r&d about the companies strength in which you are going for an interview, be honest.

Sanjeev Group Interview FAQs

How many rounds are there in Sanjeev Group Deputy Manager interview?
Sanjeev Group interview process usually has 3 rounds. The most common rounds in the Sanjeev Group interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Sanjeev Group Deputy Manager interview?

Some of the top questions asked at the Sanjeev Group Deputy Manager interview -

  1. Basic function in ...read more
  2. Working in LPG bul...read more

Tell us how to improve this page.

Sanjeev Group Deputy Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Production Engineer
7 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Maintenance Engineer
6 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Production Supervisor
6 salaries
unlock blur

₹1.4 L/yr - ₹3.7 L/yr

Quality Engineer
5 salaries
unlock blur

₹1.5 L/yr - ₹2.2 L/yr

Asst Store
5 salaries
unlock blur

₹1.2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare Sanjeev Group with

Quess

3.9
Compare

L&T Construction

4.0
Compare

Udaan

4.0
Compare

Ekart Logistics

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview