Filter interviews by
To line up the gauge glass in a steam drum, follow these steps:
Ensure the steam drum is depressurized and cooled down
Remove any obstructions or debris from the gauge glass openings
Align the gauge glass with the corresponding openings on the steam drum
Secure the gauge glass using appropriate gaskets and bolts
Tighten the bolts evenly to ensure a proper seal
Check for any leaks or abnormalities in the gauge glass
If necessa...
Top trending discussions
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
64
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Engineer
49
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Mechanical Engineer
48
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
47
salaries
| ₹5.4 L/yr - ₹14.3 L/yr |
Assistant Manager
36
salaries
| ₹5 L/yr - ₹11 L/yr |
UltraTech Cement
Ambuja Cements
ACC
JK Cement