Samsung
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Campus Placement
DS questions difficult level
BFS, DFS questions with difficult level
Yes, I am comfortable shifting to Noida for the job.
I am open to new opportunities and challenges in Noida.
I have researched about the location and am willing to relocate.
I have family or support system in Noida to help with the transition.
I applied via Campus Placement and was interviewed before Nov 2023. There were 2 interview rounds.
Quantitative Aptitude
Basic Coding Questions
I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.
Logical reasoning, digital design, analog systems
To reverse a substring, we can use string manipulation techniques.
Identify the substring to be reversed
Extract the substring from the main string
Reverse the substring using built-in functions or loops
Replace the original substring with the reversed substring in the main string
To swap variables passing by reference, use a temporary variable to store the value of one variable and then assign it to the other.
Declare a temporary variable of the same type as the variables being swapped
Assign the value of the first variable to the temporary variable
Assign the value of the second variable to the first variable
Assign the value of the temporary variable to the second variable
I appeared for an interview before Jun 2016.
Samsung interview questions for designations
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Common technical issues in air conditioning products include refrigerant leaks, faulty compressors, and clogged filters.
Refrigerant leaks can lead to decreased cooling efficiency and potential environmental harm.
Faulty compressors may result in inadequate cooling or complete system failure.
Clogged filters can restrict airflow and reduce overall system performance.
The VCRS cycle stands for Vapor Compression Refrigeration System, which is a common method used for cooling in various applications.
VCRS cycle uses a refrigerant to absorb heat from a low temperature environment and release it in a high temperature environment.
The cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.
Examples of VCRS cycle applications include air conditioning s
Sub-cooling is the process of lowering the temperature of a liquid below its boiling point to increase its efficiency in heat transfer.
Sub-cooling involves removing additional heat from a liquid to lower its temperature below its saturation point.
This process increases the efficiency of heat transfer by ensuring the liquid remains in a liquid state rather than vaporizing.
Sub-cooling is commonly used in refrigeration sy...
I appeared for an interview in Nov 2021.
Cross functional requirements understanding is crucial for successful system development.
Cross functional requirements understanding involves identifying and addressing the needs of all stakeholders involved in the system development process.
It impacts the system by ensuring that all requirements are met and that the system functions as intended.
Examples of cross functional requirements include usability, security, per...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
Group discussion about last company experience
About job responsibilities
About skill development
based on 2 interviews
Interview experience
based on 53 reviews
Rating in categories
Sales Executive
1.1k
salaries
| ₹1 L/yr - ₹6.5 L/yr |
Assistant Manager
975
salaries
| ₹5.5 L/yr - ₹19.5 L/yr |
Software Engineer
900
salaries
| ₹6.6 L/yr - ₹25 L/yr |
Manager
529
salaries
| ₹10 L/yr - ₹33 L/yr |
Senior Engineer
480
salaries
| ₹4.6 L/yr - ₹18.4 L/yr |
Apple
Vivo
OPPO
Dell