Filter interviews by
The 5 core tools are used in quality management to identify and solve problems in processes.
Check Sheet: Used to collect and analyze data in a systematic way.
Cause-and-Effect Diagram (Fishbone or Ishikawa Diagram): Helps identify and analyze potential causes of a problem.
Control Chart: Monitors process performance over time to detect any changes or trends.
Histogram: Displays the distribution of data to identify pattern...
FMEA is used for identifying and prioritizing potential failures in a process or product.
FMEA stands for Failure Mode and Effects Analysis
It helps in proactively identifying potential failures and their impact
FMEA prioritizes the failures based on severity, occurrence, and detection
It is commonly used in industries like automotive, aerospace, and manufacturing
Example: Using FMEA to identify potential failure modes in a...
Top trending discussions
posted on 22 Mar 2024
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 29 Apr 2025
I appeared for an interview in Mar 2025, where I was asked the following questions.
posted on 7 Mar 2025
I appeared for an interview before Mar 2024.
Effective planning involves prioritizing tasks, allocating resources, and ensuring clear communication within the team.
Assess current workload: Review ongoing projects and deadlines to understand what needs immediate attention.
Prioritize tasks: Use a priority matrix to categorize tasks by urgency and importance, ensuring critical tasks are addressed first.
Allocate resources: Assign team members based on their strengths...
Effective work scheduling involves prioritization, time management, and flexibility to adapt to changing circumstances.
Prioritize tasks using the Eisenhower Matrix to distinguish between urgent and important tasks.
Set specific, measurable goals for each day to maintain focus and track progress.
Use digital tools like calendars or project management software to visualize deadlines and allocate time effectively.
Incorporat...
I believe in acknowledging mistakes, learning from them, and using them as opportunities for growth and improvement.
Acknowledge the mistake promptly to take responsibility.
Analyze what went wrong and identify the root cause.
Share the experience with the team to foster a culture of learning.
Implement corrective actions to prevent similar mistakes in the future.
For example, if I mismanaged a project timeline, I would rev...
Maintain professionalism, respect, and open communication with reporting seniors and management for effective collaboration.
Show respect: Always address your seniors and management with appropriate titles and a polite tone. For example, use 'Mr.', 'Ms.', or 'Dr.' as applicable.
Be proactive: Anticipate their needs and provide updates on your work without waiting for them to ask. For instance, send weekly progress report...
Effective resolution of team issues involves open communication, active listening, and collaborative problem-solving.
Encourage open communication: Create a safe space for team members to express their concerns without fear of judgment.
Active listening: Make sure to listen attentively to each team member's perspective before jumping to conclusions.
Collaborative problem-solving: Involve the team in brainstorming solution...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 2 interview rounds.
I have highlighted key points in my CV from the beginning to the end.
Started with educational background and relevant qualifications.
Highlighted work experience and key achievements in each role.
Included skills and competencies that are relevant to the Deputy Manager position.
Mentioned any additional certifications or training programs completed.
Concluded with a brief summary of career goals and aspirations.
Provided co...
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is calculated as total downtime divided by the number of failures.
MTBF is calculated as total uptime divided by the number of failures.
For example, if a system has an MTTR of 2 hours and an MTBF of...
Data type string in PLC is used to store alphanumeric characters or text data.
String data type is used to store text data in PLC programming.
Strings can be used to store alphanumeric characters, words, sentences, etc.
Example: STRING name := 'John Smith';
posted on 24 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
Materials management involves planning, organizing, and controlling materials flow to optimize efficiency and reduce costs.
Involves procurement, storage, and distribution of materials.
Ensures timely availability of materials for production processes.
Utilizes inventory management techniques to minimize waste.
Example: Just-in-time (JIT) inventory systems reduce holding costs.
Involves collaboration with suppliers for qual...
Store operations involve managing inventory, staff, customer service, and sales to ensure efficient and profitable retail performance.
Inventory Management: Regularly track stock levels to avoid overstocking or stockouts. For example, using an inventory management system can streamline this process.
Staff Training: Ensure employees are well-trained in customer service and product knowledge. For instance, conducting regul...
posted on 13 Dec 2024
I appeared for an interview in Apr 2024, where I was asked the following questions.
Engine stall refers to a sudden loss of power in an engine, often due to fuel or air supply issues.
An engine stall occurs when the engine stops running unexpectedly.
Common causes include fuel starvation, air intake issues, or electrical failures.
For example, a car may stall if it runs out of fuel or if the fuel pump fails.
Stalling can also happen in aircraft engines during takeoff or landing due to improper throttle ma...
I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.
Africa is a continent with 54 countries, each with its own unique culture, history, and natural resources.
Africa has 54 countries
The largest country in Africa is Algeria
The most populous country in Africa is Nigeria
Egypt is known for its ancient pyramids and Sphinx
South Africa is known for its wildlife and natural beauty
Kenya is known for its wildlife and safaris
Ethiopia is known for its coffee and ancient history
Ghana...
I have 5 years of experience in the same product industry, working on various projects and gaining expertise in the field.
Worked on product development and improvement projects
Collaborated with cross-functional teams to ensure product quality and efficiency
Implemented new technologies and processes to enhance product performance
Participated in product testing and validation processes
Provided technical support and train...
based on 1 interview experience
based on 8 reviews
Rating in categories
Quality Engineer
6
salaries
| ₹2 L/yr - ₹3 L/yr |
Development Engineer
6
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
COO
4
salaries
| ₹18 L/yr - ₹20 L/yr |
QA Engineer
4
salaries
| ₹2.4 L/yr - ₹2.8 L/yr |
Design & Development Engineer
3
salaries
| ₹4.1 L/yr - ₹4.8 L/yr |
African Industries
Nava Limited
Nagata India
Knest Manufacturers