Filter interviews by
The product to be developed should focus on improving the efficiency and scalability of flow chemistry and synthesis processes.
Develop a new catalyst for a specific reaction to increase yield and selectivity
Design a continuous flow system for a key step in a pharmaceutical synthesis
Create a software tool to optimize reaction conditions in flow chemistry
Explore new methods for in-line analysis and purification of reacti
The number of reactions to be handled will depend on the specific projects and workload of the team.
The number of reactions will vary based on the complexity and scale of the projects assigned.
It is important to prioritize and manage the reactions efficiently to meet project deadlines.
Regular communication with team members and supervisors can help in determining the workload and distribution of reactions.
Examples: Han...
I applied via Company Website and was interviewed before Aug 2023. There were 2 interview rounds.
The MEE plant plays a crucial role in the company by treating wastewater from various processes to meet environmental regulations.
The MEE plant is responsible for treating wastewater generated from different processes within the company.
It uses multiple stages of evaporation to concentrate the wastewater and remove impurities.
The treated water is then reused or discharged in compliance with environmental regulations.
Th...
MLSS and MLVSS are key parameters used in wastewater treatment to measure the concentration of solids in the system.
MLSS stands for Mixed Liquor Suspended Solids and represents the total concentration of solids (organic and inorganic) in the wastewater treatment system.
MLVSS stands for Mixed Liquor Volatile Suspended Solids and represents the concentration of organic solids in the system.
MLVSS is a subset of MLSS and i...
Chemical dosing in water treatment is crucial for maintaining water quality and ensuring effective treatment processes.
Chemical dosing is the process of adding specific chemicals to water to achieve desired treatment outcomes.
The dosing rate and frequency depend on the water quality parameters and treatment objectives.
Examples of chemicals used for dosing in water treatment include chlorine for disinfection, coagulants...
Msc environmental science
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Refrigeration is the process of removing heat from a space, substance, or system to lower and/or maintain its temperature.
Refrigeration involves the use of refrigerants to absorb and remove heat from a space.
It is used in various applications such as air conditioning, food preservation, and industrial processes.
The basic principle of refrigeration is the transfer of heat from a low temperature area to a high temperatur...
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
Cohizon Life Sciences Limited interview questions for popular designations
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
My family consists of me, my wife, my son and my parents.
I appeared for an interview before Mar 2024, where I was asked the following questions.
As an Engineering Manager, I focus on team empowerment, project delivery, and fostering innovation through collaboration.
Empowerment: I encourage team members to take ownership of their projects, leading to increased motivation and accountability. For example, I implemented a 'lead engineer' role for key projects.
Communication: I prioritize open communication, holding regular one-on-ones and team meetings to ensure eve...
Effective work planning involves setting clear goals, prioritizing tasks, and ensuring timely execution within deadlines.
Define clear objectives: Establish what needs to be achieved within the timeframe, e.g., completing a project milestone.
Prioritize tasks: Use methods like the Eisenhower Matrix to identify urgent vs. important tasks, ensuring focus on high-impact activities.
Break down projects: Divide larger projects...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I seek new challenges and opportunities for growth that align with my career goals and values.
Desire for professional growth: I want to expand my skills and take on more responsibilities.
Cultural fit: I'm looking for a company whose values align with mine, such as teamwork and innovation.
Career advancement: I aim for a position that offers clear pathways for advancement, which my current role lacks.
New challenges: I'm ...
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.
The optimum diameter of a pump depends on various factors such as flow rate, head, viscosity, and efficiency.
The diameter should be selected based on the required flow rate and head of the system.
Higher viscosity fluids require larger diameter pumps to reduce frictional losses.
Efficiency of the pump increases with larger diameter impellers.
The diameter should also be selected based on the available space and cost const...
Stream balance inside distillation column is crucial for efficient separation of components.
Stream balance refers to the equal distribution of feed and product streams across the column.
Imbalance can lead to poor separation efficiency, flooding, or tray damage.
Factors affecting stream balance include tray design, liquid and vapor flow rates, and column diameter.
Techniques such as tray hydraulics and computational fluid...
Designing a distillation column for binary mixtures involves determining the number of trays, feed location, and reflux ratio.
Determine the boiling points of the components
Calculate the minimum reflux ratio
Choose the number of trays based on the desired separation
Determine the feed location based on the composition of the feed
Design the reboiler and condenser
Consider the pressure drop across the column
Top trending discussions
The duration of Cohizon Life Sciences Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 9 interviews
Interview experience
based on 234 reviews
Rating in categories
Production Officer
168
salaries
| ₹1.8 L/yr - ₹5.7 L/yr |
Assistant Manager
57
salaries
| ₹6.9 L/yr - ₹15 L/yr |
Senior Executive
52
salaries
| ₹4.6 L/yr - ₹11 L/yr |
Officer
45
salaries
| ₹2 L/yr - ₹6 L/yr |
Shift Incharge
37
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Asian Paints
Berger Paints
Pidilite Industries
SRF