i
Saint-Gobain
Filter interviews by
Be the first one to contribute and help others!
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.
posted on 13 Jun 2021
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Team Member
524
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
176
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Software Engineer
172
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Senior Software Engineer
168
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company