i
Saint-Gobain
Filter interviews by
Be the first one to contribute and help others!
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
I applied via Company Website and was interviewed before Sep 2021. There were 4 interview rounds.
I have a strong profile and extensive experience in project management.
Over 10 years of experience in leading and delivering successful projects
Proven track record of managing large cross-functional teams
Expertise in budgeting, resource allocation, and risk management
Strong communication and stakeholder management skills
Experience in various industries including technology, construction, and healthcare
Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.
Designing and testing electrical systems and equipment
Developing and implementing electrical projects
Troubleshooting and repairing electrical issues
Collaborating with other engineers and professionals
Examples: designing power grids, developing renewable energy sources, creating electronic devices
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
3 candidate was their vs 1 opening
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
Medium tough level test, strong basics required in all fields of civil.
A float can be made zero in critical path tasks by reducing the duration of non-critical tasks.
Identify non-critical tasks that have float
Shorten the duration of non-critical tasks to eliminate float
Focus on tasks that have the highest float value to reduce overall project duration
Baseline schedule is the original planned schedule for a project, used as a reference point for tracking progress.
Baseline schedule is created at the beginning of a project to establish the original plan for project activities and timelines.
It serves as a benchmark for comparing actual progress and identifying deviations from the original plan.
Changes to the baseline schedule may require formal approval and documentati...
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
Team Member
526
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
176
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Software Engineer
172
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Senior Software Engineer
168
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company