Filter interviews by
I applied via LinkedIn and was interviewed in Jul 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
Ladder logic is a programming language used in industrial control systems. It uses ladder diagrams to represent logic functions.
Ladder logic is commonly used in programmable logic controllers (PLCs) to control and automate industrial processes.
It is based on the concept of relay logic, where electrical circuits are represented using ladder diagrams.
Ladder logic diagrams consist of rungs, which contain contacts and coil...
I was interviewed before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
A CNC machine is a computer-controlled machine tool used for cutting and shaping materials like metal, wood, or plastic.
CNC stands for Computer Numerical Control
It uses coded instructions to control the movement of the cutting tool
Common types include CNC milling machines and CNC lathes
CNC machines are widely used in manufacturing industries for precision machining
ERP stands for Enterprise Resource Planning, a software system that helps organizations manage and integrate their important business processes.
ERP systems help streamline and automate business operations, including finance, HR, manufacturing, supply chain, and more
They provide a centralized database that allows different departments to access and share information in real-time
Examples of popular ERP systems include SA
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
Typical water cement ratios range from 0.4 to 0.6 for normal strength concrete.
For high strength concrete, water cement ratios can be as low as 0.25.
I applied via Naukri.com and was interviewed in Nov 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
7 QC tools are used for quality control in manufacturing. They are simple and effective tools to identify and solve problems.
Check sheets - used to collect data and analyze it
Pareto charts - used to identify the most frequent problems
Histograms - used to show the distribution of data
Cause-and-effect diagrams - used to identify the root cause of a problem
Flowcharts - used to show the steps in a process
Control charts - u...
FMEA is a risk assessment tool used to identify and mitigate potential failures. 5S is a workplace organization method. CP and CPS are statistical process control measures.
FMEA stands for Failure Mode and Effects Analysis. It is a systematic approach to identifying and mitigating potential failures in a process or product.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing,...
CTQ stands for Critical to Quality and CTC stands for Critical to Customer.
CTQ is a measurable characteristic of a product or process that is important to the customer.
CTC is a measurable characteristic of a product or process that directly impacts customer satisfaction.
Identifying CTQs and CTCs helps in improving the quality of the product or process.
Examples of CTQs and CTCs include product reliability, on-time deliv...
Gauges are instruments used to measure various physical quantities. There are different types of gauges for different purposes.
Pressure gauges measure pressure of fluids or gases
Temperature gauges measure temperature of substances
Thickness gauges measure thickness of materials
Wire gauges measure diameter of wires
Bore gauges measure diameter of holes
Thread gauges measure pitch and diameter of screws
Fuel gauges measure f
Instrument handling refers to the proper use, care, and maintenance of tools and equipment used in a particular field.
Properly clean and sterilize instruments before and after use
Handle instruments with care to prevent damage or contamination
Store instruments in a safe and organized manner
Regularly inspect instruments for wear and tear
Follow manufacturer's instructions for use and maintenance
Examples: surgical instrume
Yes, I am familiar with GD&T symbols.
GD&T stands for Geometric Dimensioning and Tolerancing
It is a system of symbols used to specify the dimensions and tolerances of a part
Examples of symbols include concentricity, perpendicularity, and flatness
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Project Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Instrument Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Resident Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Kennametal
Sandvik Asia
Miranda Tools