Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Types of pilling work
Site responsibility includes overseeing construction activities, ensuring compliance with plans and specifications, managing subcontractors, and ensuring safety regulations are followed.
Overseeing construction activities on site
Ensuring compliance with plans and specifications
Managing subcontractors and coordinating their work
Ensuring safety regulations are followed at all times
I have 5 years of experience working as a Site Engineer in construction projects.
Managed construction projects from start to finish
Performed site inspections and quality control checks
Coordinated with architects, contractors, and subcontractors
Ensured compliance with building codes and safety regulations
Prepared progress reports and communicated with stakeholders
A site engineer should have knowledge of construction techniques, project management, and communication skills.
Understanding of construction drawings and specifications
Knowledge of building codes and regulations
Ability to manage project timelines and budgets
Strong communication and problem-solving skills
Experience with construction software and tools
Ability to work well in a team and lead a construction crew
To read the North direction of a drawing, look for the North arrow symbol or compass rose.
Look for the North arrow symbol on the drawing, usually pointing towards the top of the page.
Check for a compass rose which indicates the orientation of the drawing.
If there is no North arrow or compass rose, refer to the project specifications or ask the designer for clarification.
Twenty important points of civil Site work include surveying, excavation, foundation work, concrete pouring, structural framing, roofing, plumbing, electrical work, finishing work, landscaping, etc.
Surveying to determine site boundaries and levels
Excavation for foundations and utilities
Foundation work for supporting structures
Concrete pouring for slabs, columns, and walls
Structural framing for building skeleton
Roofing ...
BBS schedule of drawing can be found by consulting the project manager or checking the project documentation.
Consult the project manager or supervisor for the BBS schedule of drawing.
Check the project documentation or specifications for the BBS schedule.
BBS schedule helps in planning and tracking the reinforcement work efficiently.
It ensures that the correct amount and type of reinforcement is used in construction.
Help...
Top trending discussions
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
25 Civil Engineering related Questions
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Civil Site Engineer
57
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Site Engineer
51
salaries
| ₹1.9 L/yr - ₹5.8 L/yr |
Project Engineer
16
salaries
| ₹4.1 L/yr - ₹7.1 L/yr |
Project Manager
14
salaries
| ₹6 L/yr - ₹15 L/yr |
Supervisor
11
salaries
| ₹1.5 L/yr - ₹5 L/yr |
ABCI Infrastructures
Lea Associates South Asia
R.V.R. PROJECTS
Ajax Engineering