Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
I am a motivated and skilled Junior Engineer Executive with a passion for problem-solving and a strong interest in this position.
I have a Bachelor's degree in Engineering and have completed internships where I gained hands-on experience in engineering tasks.
I am proficient in using various engineering software and tools, such as AutoCAD and MATLAB.
I have a strong analytical mindset and enjoy finding innovative solution...
Answering interview questions for Junior Engineer Executive position
1) Leaving current job due to lack of growth opportunities and desire for new challenges
2) Messed up by misinterpreting instructions and causing delays in project completion
3) Experienced conflict with a co-worker due to difference in work styles and resolved it through open communication and compromise
posted on 24 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.
Earthing involves creating a connection between the electrical system and the earth.
It is done by burying a metal conductor, such as a copper rod, in the ground.
The metal conductor is connected to the electrical system using a wire or cable.
Earthing provides a path for...
The type of DGs used at our site are diesel generators.
Diesel generators are commonly used as backup power sources in various industries.
They are reliable and can provide a continuous power supply during electrical outages.
DGs are often used in remote locations or areas with unreliable grid power.
They require regular maintenance and fuel supply to operate efficiently.
Examples of DGs used at our site include Cummins, Ca
LT line refers to Low Tension line while HT line refers to High Tension line.
LT line carries low voltage and is used for domestic and small-scale commercial purposes.
HT line carries high voltage and is used for industrial and large-scale commercial purposes.
LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.
LT lines are usually overhead lines, while HT lines can be both overhead and ...
We used different types of circuit breakers at the site depending on the specific requirements.
We used air circuit breakers (ACBs) for low voltage applications.
For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).
In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.
For specialized applications like generator protection, we used differential ...
The size of transformers used at the site varied depending on the specific requirements of the project.
Transformers used at the site were of different sizes based on the power demand of the electrical system.
For smaller projects, transformers with a capacity of around 100 kVA were used.
For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.
For larger projects, transformers wit...
We used a stationary type batching plant at the site.
We used a stationary type batching plant for our construction project.
The stationary batching plant had a higher production capacity compared to mobile plants.
It was equipped with multiple storage bins for different types of aggregates.
The plant had a conveyor belt system to transfer the aggregates to the mixer.
We used this type of batching plant because it provided
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
posted on 15 Feb 2024
It was easy and standard questions
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
posted on 26 Apr 2023
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
posted on 2 Mar 2022
I applied via AmbitionBox and was interviewed in Oct 2021. There were 2 interview rounds.
There are four members in my family first of my respected father government sarvent then my lovely mother she has been source of inspiration and motivation for me she is house maker other family are one younger sister both are studying
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
System Engineer
7
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Safety Steward
6
salaries
| ₹2.3 L/yr - ₹3 L/yr |
Control Room Officer
6
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Assistant Manager
5
salaries
| ₹5.5 L/yr - ₹9.5 L/yr |
Project Manager
5
salaries
| ₹28.8 L/yr - ₹32.5 L/yr |
Travel Food Services
Lite Bite Foods
café Coffee day
HMSHost