Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
posted on 15 Jul 2022
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
The types of maintenance for construction machinery include preventive, corrective, and predictive maintenance.
Preventive maintenance involves regularly scheduled inspections, cleaning, and servicing to prevent breakdowns and extend the lifespan of the machinery.
Corrective maintenance is performed when a machine breaks down or malfunctions, and it involves repairing or replacing faulty components.
Predictive maintenance...
Yes, my expected salary is negotiable.
Express willingness to negotiate salary
Highlight flexibility in terms of compensation
Provide examples of previous successful salary negotiations
posted on 18 Jun 2023
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Compound number, clocks, Average, Percentage
posted on 20 Apr 2021
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
posted on 28 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
The thickness of a tile can vary depending on the type and size of the tile being used.
Tile thickness typically ranges from 1/4 inch to 3/4 inch.
Larger tiles may have a thicker thickness to support their weight.
Thin tiles are often used for wall applications, while thicker tiles are used for flooring.
Porcelain tiles are usually thicker than ceramic tiles.
The thickness of marble can vary depending on the type and purpose, but it is typically between 3/4 inch to 1 1/4 inches.
Marble thickness can range from 3/4 inch to 1 1/4 inches
Thicker marble is often used for countertops and flooring
Thinner marble may be used for wall cladding or decorative purposes
The process of flooring involves selecting the appropriate materials, preparing the subfloor, laying the flooring material, and finishing with trim.
Selecting the appropriate flooring material based on the location and usage (e.g. hardwood, laminate, tile, carpet)
Preparing the subfloor by ensuring it is clean, level, and dry
Laying the flooring material according to manufacturer's instructions, starting from the center o...
Types of tiles include ceramic, porcelain, glass, and natural stone. Cement ratio in tile installation varies depending on the type of tile and substrate.
Types of tiles: ceramic, porcelain, glass, natural stone
Cement ratio varies based on tile type and substrate
Ceramic tiles typically require a 1:4 cement to water ratio for installation
Porcelain tiles may need a 1:3 cement to water ratio for proper adhesion
Flooring process involves selecting materials, preparing the subfloor, installing the flooring, and finishing with trim.
Selecting appropriate flooring material based on budget, durability, and aesthetics (e.g. hardwood, laminate, tile, carpet)
Preparing the subfloor by ensuring it is clean, level, and dry before installation
Installing the flooring by following manufacturer's instructions and using proper tools (e.g. adh...
The cement ratio for flooring depends on the type of flooring and the strength required.
The typical cement ratio for standard concrete flooring is 1:2:4 (cement:sand:aggregate)
For high strength flooring, the ratio can be increased to 1:1.5:3
For decorative or polished concrete flooring, a lower water-cement ratio is used to achieve a smoother finish
posted on 15 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 7 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 5 interview rounds.
posted on 18 Oct 2021
I was interviewed before Oct 2020.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Executive
38
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Hindustan Construction Company
Shapoorji Pallonji Group