Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
General aptitude questions.(moderate level)
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
posted on 10 Feb 2024
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 3 interview rounds.
Technical related questions and answers
My last company name
My last company CTC was $60,000 per year.
My last company CTC was $60,000 per year
CTC stands for Cost to Company
It includes salary, bonuses, benefits, and any other perks
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 2 Nov 2022
I applied via Recruitment Consulltant
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
posted on 23 Feb 2022
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
posted on 17 Jan 2021
I applied via Referral
Senior Engineer
48
salaries
| ₹4.3 L/yr - ₹9.6 L/yr |
Civil Engineer
42
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Mechanical Engineer
40
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
37
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Safety Executive
33
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
L&T Construction
Tata Projects
Hindustan Construction Company
Shapoorji Pallonji Group