Upload Button Icon Add office photos

Filter interviews by

RPP Infra Projects Electrician Maintenance Technician Interview Questions and Answers

Updated 2 May 2024

RPP Infra Projects Electrician Maintenance Technician Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Electrician & mechanical engineering services working
  • Q2. Work on the question
Round 2 - Technical 

(2 Questions)

  • Q1. Electrician work
  • Q2. Maintenance questions

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers

I applied via Apna Jobs and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Discuss about quality Control work

Round 3 - HR 

(1 Question)

  • Q1. Salary discussion Previous and expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir,
I am Arun Kumar Mishra apply to senior lab Technician. Please find my attached information 🙏.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Sir, Can I got Company Details ?
  • Q2. Sir, Can I know Interview process?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is CT and PT
  • Ans. 

    CT stands for Current Transformer and PT stands for Potential Transformer. They are used in electrical systems for measurement and protection purposes.

    • CT is used to measure current in high voltage circuits by stepping down the current to a safe level for measurement.

    • PT is used to measure voltage in high voltage circuits by stepping down the voltage to a safe level for measurement.

    • Both CT and PT are essential components...

  • Answered by AI
  • Q2. What is DTC structure
  • Ans. 

    DTC structure stands for Direct Torque Control structure, a control method used in AC motor drives for precise torque and speed control.

    • DTC structure is a control technique used in AC motor drives to directly control torque and flux without the need for a separate speed controller.

    • It is based on the principle of controlling the torque and flux by selecting the appropriate voltage vectors in the motor.

    • DTC structure offe...

  • Answered by AI
  • Q3. Use of LA, AB switch
  • Ans. 

    LA, AB switch is used in electrical engineering to switch between two different signal sources or destinations.

    • LA, AB switch is commonly used in audio and video equipment to switch between different inputs or outputs.

    • It allows for easy switching between two different signal sources or destinations without having to physically disconnect and reconnect cables.

    • The switch typically has two positions - one for each signal s...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pile related and stressing related and what type of work is working on
  • Q2. Density of bentonite Prestressing formula
  • Ans. 

    Density of bentonite and prestressing formula are two separate topics in civil engineering.

    • Density of bentonite is typically around 2.0-2.5 g/cm^3.

    • Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.

    • Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep interview frelly and discussion
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. CoS billing procedure
  • Ans. 

    CoS billing procedure involves categorizing and prioritizing traffic for billing purposes.

    • CoS (Class of Service) is a method used in networking to prioritize different types of traffic.

    • Billing procedures based on CoS involve assigning costs or charges to different classes of service.

    • Examples include charging more for high-priority traffic like VoIP calls compared to lower-priority data traffic.

  • Answered by AI
  • Q2. Client billing

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. 1) Describe about Launching girder, Launching operations methods
  • Ans. 

    Launching girder is a temporary structure used in construction to move and position heavy loads.

    • Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.

    • It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.

    • The launching operation involves the step-by-step movement of the girder along...

  • Answered by AI
  • Q2. 2) Launching girder steel grade, macalloy bar charactersic, capacity
  • Q3. 3) Tendon grouting activity
  • Q4. 4)Heavy lifting activities,
  • Q5. 5) Glueing technic,about materials character
  • Q6. 6)Bearing work
  • Q7. 6)ROB Erection work

Interview Preparation Tips

Interview preparation tips for other job seekers - 1)study drawing and read every point mentioned in notes point of drawing carefully..
Round 1 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 2 - Technical 

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. MEP Electrical Engineer with over 11 years experience.
  • Q2. If any requirment? Then will contact me

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good knowledge of MEP Project.

RPP Infra Projects Interview FAQs

How many rounds are there in RPP Infra Projects Electrician Maintenance Technician interview?
RPP Infra Projects interview process usually has 2 rounds. The most common rounds in the RPP Infra Projects interview process are HR and Technical.
What are the top questions asked in RPP Infra Projects Electrician Maintenance Technician interview?

Some of the top questions asked at the RPP Infra Projects Electrician Maintenance Technician interview -

  1. Electrician & mechanical engineering services work...read more
  2. Maintenance questi...read more
  3. Work on the quest...read more

Tell us how to improve this page.

RPP Infra Projects Electrician Maintenance Technician Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Ashoka Buildcon Interview Questions
4.0
 • 64 Interviews
PNC Infratech Interview Questions
3.9
 • 60 Interviews
SYSTRA Interview Questions
4.0
 • 23 Interviews
View all
Site Engineer
81 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Site Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare RPP Infra Projects with

Nagarjuna Construction Company

4.1
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview